Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Toothpick Bridge Building rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Toothpick Bridge Building
Toothpick Bridge Building
Bridge must be designed and constructed out of toothpicks and glue only. The bridge must be built to allow passage of a car to pass.
Rubric Code:
U24X844
By
Sdunn411
Ready to use
Public Rubric
Subject:
Physics
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Score
Advanced
4 pts
Profecient
3 pts
Basic
2 pts
Below Basic
1 pts
TeamWork
Advanced
Each member had a clear understanding of his/her job and performed duties well.
Members were able to compromise when different opinions were held.
Profecient
Each member had a clear understanding. Had to be redirected when off task..occurred more than once but less than four times.
Basic
Members had to be retaught job responsibilities. Teacher intervention needed to settle difference of opinions.
Below Basic
Frequent absences by members caused disruption of work. Intervention was needed when there was a difference of opinion.
Members had to be continually redirected to task.
Material
Advanced
The group used only the materials toothpicks and glue. The group did not waste any material.
Profecient
The group used only the materials toothpicks and glue. The group wasted some material making their bridge.
Basic
The group used only the materials toothpicks and glue. The group wasted a lot of material making their bridge.
Below Basic
The group used materials other than toothpicks and glue.
Dimensions
Advanced
Bridge is between 15 and 24 inches long, under 5 inches wide, and under 10 inches tall.
Profecient
Bridge is between 15 and 24 inches long and either over 5 inches wide, or over 10 inches tall.
Basic
Bridge is between 15 and 24 inches long, but over 5 inches wide and over 10 inches tall.
Below Basic
Bridge is longer than 24 inches.
Weight
Advanced
Bridge is able to support at least 1000 grams.
Profecient
Bridge can support between 750 and 1000 grams.
Basic
Bridge can support between 500 and 750 grams.
Below Basic
Bridge can support between 250 and 500 grams.
Usable
Advanced
A hot wheels car is able to be pushed across the bridge without stopping.
Profecient
A hot wheels car is able to be pushed across the bridge with only one stop.
Basic
A hot wheels car is able to be pushed across the bridge with only two stop.
Below Basic
A hot wheels car is able to be pushed across the bridge with only three stop.
Keywords:
toothpick, bridge, build
Subjects:
Engineering
Math
Physics
Science
(General)
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Engineering rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n98
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.