5 pts
10 pts
15 pts
20 pts
Coaster must be labeled with group name and be neat and well thought out.
Marble must make it from the beginning of the track to the end and not roll off the coaster base.
Roller coaster must be able to stand without students holding it up. Hills and loops are included .
Teams must work together on this project. Everyone participated in presenting.