5 pts
10 pts
15 pts
20 pts
Track must be labeled with group name and be neat and well thought out.
Marble must make it from the beginning of the track to the end and land in the cup.
Roller coaster must be able to stand without students holding it up. Hills and loops are included as per the constraints.
The final roller coaster design matches the sketch chosen by the group.
Includes: *marbles time to the bottom * the mass of the marble * the length of the track * the height of the hill
Teams must work together on this project. Each student must work equally with the other students