Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Hand Sewing Project Rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Hand Sewing Project Rubric
Hand Sewing Project Rubric
Pouch
Rubric Code:
RXA3C66
By
BarbaraThompson
Ready to use
Public Rubric
Subject:
Education
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Hand Sewing Project
Needs Improvement
2 pts
Good
3 pts
Excellent
4 pts
Side Stitching
Needs Improvement
Stitches are not evenly spaced the correct distance apart or are the same length.
Stitching is not tight enough to secure the opening on one or more side.
Good
Most of the stitches are evenly spaced the correct distance apart and are the correct length.
Stitching is almost secured on both sides to secure the opening.
Excellent
All of the stitches are evenly spaced the correct distance apart and are the same in length.
Stitching is secured on both sides and holds the pouch closed.
Threads
Needs Improvement
Threading is too loose throughout the project. Knots are visible.
Good
A few loose threads and knots are visible.
Excellent
No loose threads or knots are visible.
Snaps
Needs Improvement
Snaps are not secured properly with the required number of stitches. Cross stitching is evident from hole to hole.
Stitching is shown on the underside of the project.
Good
Snaps are almost secured with the required number of stitches. Some cross stitching from the snap holes is evident. Knots may not all be hidden on each snap.
Excellent
Snaps are fastened with the required number of stitches. Knot is neatly hidden with the underside free of stitches. Snaps are attached based on given instructions.
Overall Appearance
Needs Improvement
Project shows lack of effort.
Cut edges are uneven and jagged.
Good
Project looks good.Effort was applied into making the project. Most of the edges are smooth with only a very few uneven spots.
Excellent
Project looks great! Full effort was applied into making the project. Edges are smooth and even.
Time Management
Needs Improvement
Student did not get started immediately after entering the classroom.
Too much time was spend socializing.
Student did not accomplish a significant amount of work in the class period.
Good
Student generally started working after entering the classroom.
Student was generally focused and utilized class time.
Student worked quietly.
Excellent
Project was turned in on time or early.
Student utilized class time each day and worked quietly.
Subjects:
Education
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Education rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n98
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.