Skip to main content
iRubric: Truss Bridge Building rubric

iRubric: Truss Bridge Building rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Truss Bridge Building 
Truss-inspired bridge must be designed and constructed out of file folders and glue. The bridge must be able withstand a minimum of one textbook without breaking.
Rubric Code: P75552
Ready to use
Public Rubric
Subject: Math  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Score
100
  Level 1

1-5points

1 pts

Level 2

6-10points

2 pts

Level 3

11-15points

3 pts

Level 4

16-20points

4 pts

Use of Materials

Level 1

Not aesthetically pleasing (shapes, patterns, color, etc.)

Work is sloppy throughout.

Design is unattractive and/or plain.
Level 2

Limited aesthetics
(shapes, patterns, color, etc.)

Design and use of glue is messy at times.

Some visual appeal.
Level 3

Overall, an attractive bridge (shapes, patterns, color, etc.)

Tidy work most of the time.

Visually appealing.
Level 4

Extremely aesthetic in design (shapes, patterns, color, etc.)

All constuction is clean and attractive.

Visually appealing.
Structure

Level 1

Truss bridge does not consist of base, two sides and top (no real design).

INCOMPLETE...
Level 2

Truss bridge consists of, two sides and top, and is very unfinished.
Level 3

Truss bridge consists of base, two sides and top but is somewhat finished.
Level 4

Truss bridge consists of base, deck, two sides and top and is complete.
Structure

Level 1

Bridge design does not match the design of the blueprint. Was not a truss bridge.

Does not hold one textbook.
Level 2

Bridge design somewhat matches the design of the blueprint and meets limited guidelines of the truss bridge.

Holds one book only.
Level 3

Bridge blueprint mostly matches the design of the finished product and somewhat meets the guidelines of the truss bridge.

Holds two books.
Level 4

Bridge blueprint matches the design of the finished product and meets all of the guidelines of the truss bridge.

Holds more than two books.
Teamwork

Level 1

Participates in less than half the days' planned activities. Usually carries on conversations not pertaining to building bridges. Mostly poor attitude, little work; effort
Level 2

Participates in only half of the days' planned activities. Work effort is lacking at times; not always cooperative.
Level 3

Participates in most of the days' planned activities. Mostly positive, upbeat, cooperative, pleasant, and hard working--a good attitude most of the time.
Level 4

Participates in all days' planned activities. Positive, upbeat, cooperative, pleasant, and hard working.
Materials

Level 1

Ran out of materials -- did not plan structure according to supplied pieces.
Level 2

Ran out of materials didn't plan structure according to supplied pieces, but did get material in time with the correct lengths
Level 3

Had enough material but had to splice pieces together here and there. Poor planning.
Level 4

Planned design according to supplied material quantity and lengths.



Keywords:
  • bridge, structures, forces, science


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n232