Skip to main content
iRubric: Building Bridges rubric

iRubric: Building Bridges rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Building Bridges 
Bridge to be made out of multiple materials and joining methods. Width of bridge deck must be a minimum of 15 centimeters. The bridge must be able withstand a maximum of 5 kilograms of weight without failing or sagging more than 5 centimeters.
Rubric Code: KXC5BBX
Ready to use
Public Rubric
Subject: Science  
Type: Project  
Grade Levels: K-5, 6-8

Powered by iRubric Building Bridges
  Level 1

(N/A)

Level 2

(N/A)

Level 3

(N/A)

Level 4

(N/A)

Appearance

Level 1

Not aesthetically pleasing (shapes, patterns, colour, etc.)
Work is sloppy throughout
Design is unattractive and/or plain
Level 2

Limited aesthetics
(shapes, patterns, colour, etc.)
Design and use of glue is messy at times
Some visual appeal
Glue use..messy
Level 3

Overall, an attractive bridge (shapes, patterns, colour, etc.)
Tidy work most of the time
Visually appealing
Level 4

Extremely aesthetic in design (shapes, patterns, colour, etc.)
All construction is clean and attractive.
Visually appealing
Structure

Level 1

Basic beam bridge (no real design)
DOESN'T"T span a gap of 15 cm (unstable or incomplete)
Did not maximize use of materials
Level 2

Basic bridge with limited creative design (e.g. no trusses used)
Spans a gap of 15 cm, but remains unstable or incomplete in some way)
Limited use of materials
Level 3

Beam or arch bridge designed with good creativity.
Spans a gap of 15 cm, is complete and stable
Good use of materials
Level 4

Arch bridge designed with excellent creativity
Spans a gap of 15 cm is complete and stable
Excellent use of materials
Weight Held

Level 1

Failed with very little weight
Level 2

Failed at 10 kilograms of weight
Level 3

Sagged more than 5 cm with 10 kilograms of weight but did not fail
Level 4

Did not sag nor fail with 10 kilograms of weight
Teamwork

Level 1

No team work. One person ran the show!
No respect shown.
Level 2

Some team work
Some respect shown.
Level 3

Partners were working together, but some were distracted from their project.
Respect was observed at times.
Level 4

Each person was actively involved in the building process. All partners were treated with respect.



Keywords:
  • bridge, structures, forces, science


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98