Skip to main content
iRubric: Plastic straw Bridge rubric

iRubric: Plastic straw Bridge rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Plastic straw Bridge 
Arch or beam bridge to be made out of plastic straws, toothpicks, and tape. Width must be 25 cm. The bridge must support a toy car. The car can not fall off the bridge and the bridge must not collapse. The bridge must be able withstand a minimum weight of a small toy car without failing or sagging more than five cm.
Rubric Code: E2WW5AA
Ready to use
Public Rubric
Subject: Science  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Forces Acting on Structures:
Plastic straw Bridge
  Level 1

(N/A)

Level 2

(N/A)

Level 3

(N/A)

Level 4

(N/A)

Appearance

Level 1

Not aesthetically pleasing (shapes, patterns, strength, etc.)

Work is sloppy throughout.

Design is unattractive and/or plain.
Level 2

Limited aesthetics
(shapes, patterns, strength, etc.)

Design and use of tape is messy at times.

Some visual appeal.
Level 3

Overall, an attractive bridge (shapes, patterns, strength, etc

Tidy work most of the time.

Visually appealing.
Level 4

Extremely aesthetic in design (shapes, patterns, strength, etc.

All construction is clean and attractive.

Exceptionally visually appealing.
Structure

Level 1

Basic beam bridge (no real design).

Does not span a gap of 50 centimetres (unstable or incomplete).

Width is not at least 10 centimeters.

Did not maximize use of materials (e.g. many straws, tape, toothpicks leftover).
Level 2

Beam or arch bridge with limited creative design.

Spans a gap of 50 centimeters, but remains unstable or incomplete in some way.

Width is at least 10 centimeters.

Good use of materials.
Level 3

Beam or arch bridge designed with good creativity.

Spans a gap of 50 centimeters, is complete and stable.

Width is at least 10 centimeters.

Very good use of materials.
Level 4

Arch bridge designed with excellent creativity.

Spans a gap of 50 centimetres is complete and stable.

Width is at least 10 centimetres.

Excellent use of materials.
Weight Held

Level 1

Failed by toy car falling off or bridge collapsing.
Level 2

Successfully supported toy car.
Level 3

Supported toy car.
Level 4

Supported toy car.
Teamwork

Level 1

Partners ..no team work.. one person ran the show!

No respect shown.
Level 2

Partners ..some team work.

Some respect shown.
Level 3

Partners were working together, but occasionally distracted from their project in some way.

Respect was observed most of the time.
Level 4

Each person was actively involved in the building process.

All partners were treated with respect.



Keywords:
  • bridge, structures, forces, science, engineering


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98