Skip to main content

iRubric: Sewing Project Evaluation Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Sewing Project Evaluation Rubric 
Used to evaluate sewing projects
Rubric Code: DX85B8B
Ready to use
Public Rubric
Subject: (General)  
Type: Project  
Grade Levels: 6-8, 9-12, Undergraduate

Powered by iRubric Sewing Project Rubric
  Excellent

10 pts

Poor

6 pts

Good

8 pts

Seams

Excellent

Seams are correct in width and construction. Correct sides of fabric are together.
Poor

Seams are puckered. They are wider than what the instructions call for.
Good

Seams are wider than what are called for in the instructions. In some places correct sides of the fabric are together.
Stitches

Excellent

Stitch length is correct and tension is perfect
Poor

Stitch length is not correct or consistents, and tension is too tight or too loose
Good

Stitch length is correct, but tension is too loose or too tight at times
Cutting

Excellent

All cutting lines are straight and trimmed seams are all even
Poor

Cutting lines are not straight and trimmed seams are uneven
Good

Cutting lines are straight and most of trimmed seams are even
Pressing

Excellent

Project shows pressing was done during all steps of construction. Curved seams are well pressed
Poor

Project shows little to no evidence of pressing during sewing. Curved seams were not pressed correctly
Good

Project shows pressing was done during most of the steps during construction. Good attempt at pressing curved seams.
Neatness/Clean

Excellent

Project is clean and shows no evidence of finger prints
Poor

Project looks dirty or stained and shows evidence of finger prints
Good

Project is clean, but shows evidence of finger prints
Threads

Excellent

All threads were trimmed during the sewing process
Poor

Threads were not trimmed during the sewing process
Good

Some threads were trimmed during the sewing process
Backstitching

Excellent

All seams were backstitched during the construction process
Poor

Seams were not backstitched during the construction process
Good

Most seams were backstitched during the construction process
Time Management

Excellent

Project was turned in on time or early
Poor

Project was turned in late - after the due date
Good

Project was turned in on time.
Clean Up

Excellent

The student cleaned up room on daily basis and helped others.
Poor

The student did not help clean up their area.
Good

The student only cleaned up their area when reminded.
Knowledge of Machine

Excellent

Student needed help with sewing machine every class. Did not know how to thread machine and forgot to put presser foot down most of the time.
Poor

Student needed help with the sewing machine some of the time.
Good

Student knew how to thread sewing machine and put presser foot down all the time. Student was a help to others.
Enter Title

Excellent
Poor
Good



Keywords:
  • Apron


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n243