Skip to main content

iRubric: Straw Bridge rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
All bridges must be made out of straws and tape and spans 30 cm across the gap. The bridge has to hold at least 50 pennies
Rubric Code: C22A7C4
Ready to use
Public Rubric
Subject: Science  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Forces Acting on Structures:
100 % Straw Bridge
  Level 1

17.5 pts

Level 2

20 pts

Level 3

22.5 pts

Level 4

25 pts

Structure

Level 1

Bridge with no real design.
Does not span a gap of 30 centimeters (unstable or incomplete).
Did not maximize use of materials.
Design doesn't show triangles.
The bridge doesn't hold any weight.
Level 2

Bridge with limited creative design.<BR>
<BR>
Spans a gap of 30 centimeters, but remains unstable or incomplete in some way.
Limited use of materials.
Design has few triangles and squares.
The bridges hold some weight.
Level 3

Bridge designed with good creativity.
Spans a gap of 30 centimeters, is complete and stable.
Good use of materials.
The design has triangles or squares.
The bridge holds weight steadily.
Level 4

Bridge designed with excellent creativity.
Spans a gap of more than 30 centimeters is complete and stable.
Excellent use of materials.
The design has triangles and squares.
The bridge holds weight for more than 5 minutes.
Teamwork

Level 1

Partners ..no team work.. one person ran the show!
No respect shown.
Level 2

Partners ..some team work.
Some respect shown.
Level 3

Partners were working together, but occasionally distracted from their project in some way.
Respect was observed most of the time.
Level 4

Each person was actively involved in the building process. All partners were treated with respect.
Research and blueprint

- sketch
- research
description
- post building
reflection

Level 1

Bridge design does not match the design of the blueprint and changes were not explained.
Research was not complete. Sloppy work.
Level 2

Bridge design somewhat matches the design of the blueprint.
If any changes were made during building, they were explained a little upon reflection.
Most of research points are complete. Good work.
Level 3

Bridge blueprint mostly matches the design of the finished product.<
If changes were made during building, they were sufficiently explained upon reflection.
All research points are complete.3 Bridges are mentioned. Work is neatly done.
Level 4

Bridge blueprint matches the design of the finished product.
If any changes were made during building, they were thoroughly explained upon reflection.
All research points are complete. 4 bridges kinds are mentioned. Work is neatly done



Keywords:
  • bridge, structures, forces, science


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n224