Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: SCORING RUBRIC for Bridge Design Project
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
SCORING RUBRIC for Bridge Design Project
SCORING RUBRIC for Bridge Design Project
Bridges are made out of popsicle sticks & hot glue.
Rubric Code:
AX798XX
By
JoArnesto
Ready to use
Public Rubric
Subject:
Engineering
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Forces Acting on Structures:
Popsicle Stick Bridge using popsicle sticks, hot glue, and other material.
Poor
1 pts
Fair
2 pts
Good
3 pts
Excellent
4 pts
Appearance
Poor
Not aesthetically pleasing
Work is sloppy throughout.
Design is unattractive and/or plain.
Fair
Limited aesthetics
(shapes, patterns, etc.)
Design and use of glue is messy at times.
Some visual appeal.
Good
Overall, an attractive bridge (shapes, patterns, etc.)
Tidy work most of the time.
Visually appealing.
Excellent
Extremely aesthetic in design (shapes, patterns, etc.)
All construction is clean and attractive.
Visually appealing.
Structure
Poor
Bridge with no real design.
Did not maximize use of materials.
Fair
Bridge with limited creative design.
Limited use of materials.
Good
Bridge designed with good creativity.
Good use of materials.
Excellent
Bridge designed with excellent creativity.
Excellent use of materials.
Teamwork
Poor
Partners ..no team work.. one person ran the show!
No respect shown.
Fair
Partners ..some team work.
Some respect shown.
Good
Partners worked together, but occasionally distracted from their project in some way. Respect was observed most of the time.
Excellent
Each person was actively involved in the building process. All partners were treated with respect.
Materials
Poor
Used more glue and popsicle sticks than needed.
Fair
Good
Excellent
Used an appropriate amount of popsicle sticks. Used appropriate amounts of hot glue.
Weight Held
Poor
Failed at 1 kilograms or lower.
Fair
Failed between 1 and 1.5 kilograms of weight.
Good
Failed between 1.5 and 2 kilograms of weight.
Excellent
Failed at more than 2 kilograms of weight.
Keywords:
bridge, structures, forces, science
Subjects:
Engineering
Math
Science
(General)
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Engineering rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n98
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.