Skip to main content
iRubric: Whimsical Cardboard House rubric

iRubric: Whimsical Cardboard House rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Whimsical Cardboard House 
Rubric Code: U23A9WB
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Whimsical Cardboard House
  Poor

1 pts

Below Average

4 pts

Average

7 pts

Excellent

10 pts

Originality and Planning

Poor

Little or no evidence was planned out. They did not plan what they were going to build nor plan on what materials to use in the building. Little or No evidence of imagination.
Below Average

Some evidence of a plan. There was some thought, not really thought out. Some evidence of imagination was observed.
Average

Great evidence of planning done. The plan wasn't quite complete. Great evidence of imagination was observed.
Excellent

Excellent evidence of planning done. The plan is quite complete. Imagined/brainstormed what they were going to build.
Creativity

Poor

The project demonstrates little personal expression and problem solving skills.
Below Average

The project demonstrates an average amount of personal expression.
Average

The project demonstrates some personal expression and logical problem solving skills.
Excellent

The project demonstrates original personal expression and outstanding problem solving skills.
Construction

Poor

Some of the four walls are standing. There is not a roof. Decoration was not used creatively. House and work area are not neat and clean.
Below Average

All four walls are standing. There is not a roof. Decoration was used somewhat creatively. House and work area are somewhat neat and clean.
Average

All four walls are standing. There is a roof. Decoration was used somewhat creatively. House and work area are somewhat neat and clean.
Excellent

All four walls are standing. There is a roof. Decoration use of candy. House and work area are neat and clean.
Time Management

Poor

Did not use time well. Time was wasted during the imagining, plan, and design phase of engineering.
Below Average

Sometimes used the time well. There were times when got off task during the imagine, plan, and design phase.
Average

Good use of time, there were a few times got off task, but for the majority of the task, time was well spent.
Excellent

Great use of time. Stayed on task during each phase of the process.










Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98