Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Popsicle Stick Bridge Building rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Popsicle Stick Bridge Building
Popsicle Stick Bridge Building
The bridge will be made out of popsicle sticks and hot glue. Stick may not be cut less than 4 inches. Height may not exceed 10 inches and width may not exceed 7 inches in length. The bridge must span a distance of 14 inches and use no more than 200 popsicle sticks.
Rubric Code:
U234895
By
mreneming
Ready to use
Public Rubric
Subject:
Engineering
Type:
Project
Grade Levels:
6-8, 9-12
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Popsicle Stick Bridge
Poor
1 pts
Fair
2 pts
Good
3 pts
Excellent
4 pts
Appearance
Poor
No color
Work is sloppy..
Fair
some color
cuts not clean..
glue use..messy
Good
Glue use acceptably attractive.
Excellent
Excellent use of color
All construction is clean and exceptionally attractive.
Structure
Poor
Did not meet standards
Did not span 14 inches
Was not sturdy and had to be steadied.
Fair
Moderately met standards
Did not span 14 inches
Weak structure: started to fall apart when the testing structure was added to it.
Good
Met standards
Did span 14 inches
Was acceptably sturdy
Excellent
Exceeded standards
Did span 14 inches
Was exceptionally sturdy
Weight held
Poor
Held less than 10 lbs
Fair
Held between 10-15 lbs
Good
Held between 16-19 lbs
Excellent
Held 20+ lbs.
Teamwork
Poor
Poor team work.. one person ran the show!
No respect shown.
Fair
Team was working together, but 2 people were distracted and did not contribute to the project substantially.
Good
Team was working together, but1 person was regularly distracted and did not contribute to the project substantially.
Respect was observed at times.
Excellent
Each person was actively involved in the building process. All partners were treated with respect.
Blueprint
Poor
Bridge design does not match the design of the blueprint...
Fair
Good
Excellent
Bridge blueprint matches the design of the finished product.
Subjects:
Engineering
Science
(General)
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Engineering rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n16
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.