Skip to main content
iRubric: Stitching Project M1 rubric

iRubric: Stitching Project M1 rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Stitching Project M1 
Students will
Rubric Code: K22865A
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Requirements
  Needs Improvement

1 pts

On the Way

3 pts

Almost There

4 pts

WOW

5 pts

Appearance: Clean & Neat

Needs Improvement

Assignment is dirty, threads are not trimmed. knots are visible. Yarn is frayed/not trimmed.
On the Way

Assignment has poor appearance. Some knots and extra yarn visible.
Almost There

Assignment is clean, most threads are trimmed and most knots are not visible.
WOW

Assignment is clean, threads are trimmed. Knots are neatly hidden on the back side of the design.
Design: Color Choices/Design

Needs Improvement

Two colors used. Student did not put thought into final appearance of color choice or complexity of design. Has no pattern sheet.
On the Way

Few colors used. Student put some thought into final appearance. The overall design is acceptable. Pattern sheet is different from completed project/ Not completed pattern
Almost There

More than 3 colors used. Colors used effectively enhance design. Shows average effort/complexity of design and final appearance. Pattern sheet is completed shows design and color choice.
WOW

Colorful. Student put great effort into final appearance of project. Made color choices that enhance the design created.<BR>
Planning sheet shows extensive thought was put into the design creation.
Stitches

Needs Improvement

Shows minimal effort. Stitches are done incorrectly, some empty spaces.
On the Way

Some stitches are done correctly and and equal amount are done incorrectly or not done at all
Almost There

Stitches are mostly done correctly and all spaces are filled.
WOW

Stitches are all done correctly, all spaces are filled.
Time Management

Needs Improvement

Did not finish project in the time allotted; Disrupted work time for self and others. Was off task often.
On the Way

The student finished project using extra time. The student was working on the project at all times during class
Almost There

Project was turned in on time.
WOW

Project was finished early. Extra time was used creating additional designs.
Supply use/clean-up

Needs Improvement

Student required reminders every day about multiple supply use/clean-up procedures. Used materials incorrectly/unsafely
On the Way

Student required reminders about one or more supply use/clean-up procedures over the week.
Almost There

Student required only one reminder about supply use/clean-up procedures over the course of the week.
WOW

correct behaviors over the entire week.
*scissors used for cutting yarn, returned to their storage areas after use. *yarn balls were returned to the appropriate storage drawer. *needles were returned at the end of each period.
*stitching canvas / yarn project stored neatly in portfolio with pattern sheet.
*small scraps of yarn are discarded and pieces over 12 inches placed in their individual storage bags.
Overall Grade



Keywords:
  • sewing







Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98