Skip to main content
iRubric: Building project #1 - Greenhouse rubric

iRubric: Building project #1 - Greenhouse rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Building project #1 - Greenhouse 
Students had to build a scaled model of the Greenhouse that we built on our campus. Must have all elements,
Rubric Code: J237WC2
Ready to use
Public Rubric
Subject: Engineering  
Type: Project  
Grade Levels: 6-8, 9-12

Powered by iRubric Green House Project
Green House Project Details and steps
  Not enough

0 pts

Good effort

10 pts

Satisfactory

20 pts

Great Work

30 pts

Excellent

40 pts

Detailed drawing

Not enough

No drawing submitted
Good effort

Drawing is vague with no measurements.
Satisfactory

Drawing is easy to follow with some measurements but still too vague.
Great Work

Drawing is easy to follow with lots of detail. Measurements are given but everything is two dimensional.
Excellent

Drawing is complete. Three dimensional with all measurements. Any person in class could easily build with drawing.
List of materials

Not enough

No list of any kind is given out.
Good effort

List of variables and materials is submitted, but incomplete. Important variable or type of material is missing.
Satisfactory

List of variables and materials is submitted and is almost complete. Minor variable or type of material is missing.
Great Work

List of variables and materials is submitted and complete. All major variables are present.
Excellent

List of variables and materials is submitted and complete. All major variables are present. Team has gone above and beyond as several additional variables are being measured
Greenhouse

Not enough

No greenhouse
Good effort

Greenhouse is built but is ineffective. Construction lacks stability. Variables can't be measured. Greenhouse doesn't fit within designated footprint.
Satisfactory

Greenhouse is built but only partially effective. Greenhouse fits within designated footprint.Construction lacks stability. Some variables can be measured, but several can't be measured easily.
Great Work

Greenhouse is well built and measurements are easy to obtain. Greenhouse fits within designated footprint. Structure is sturdy and will withstand outside weather.
Excellent

Greenhouse is well built and all measurements are easily obtained. Greenhouse fits within designated footprint. Structure is sturdy and will withstand outside weather. Team has incorporated extra features that make their greenhouse a step above the rest.
Completion Schedule

Not enough

Greenhouse was not completed
Good effort

Greenhouse was partially completed in the time allotted but no finished product
Satisfactory

Greenhouse was not completed in the time allotted and needed extra time to complete
Great Work

Greenhouse was completed but needed extra time after class time to complete the project.
Excellent

Greenhouse was completed on time and no extra time was requried.
Comments:

Assessor's remarks

Not enough
Good effort
Satisfactory
Great Work
Excellent



Keywords:
  • Greenhouse, greenhouse gases, global warming







Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16