iRubric: Manila Folder Bridge Building rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Manila Folder Bridge Building 
All bridges must be made out of manila folders, card stock and white or wood glue. The bridge must be constructed using the schedule of materials and drawings included in the activity packets.
Rubric Code: GXX296A
Ready to use
Public Rubric
Subject: Engineering  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Forces Acting on Structures:
100 % Manila Folder Bridge
  Level 1

17.5 pts

Level 2

20 pts

Level 3

22.5 pts

Level 4

25 pts

Appearance

Level 1

Not aesthetically pleasing (shapes uneven, poorly cut, etc.
Work is sloppy throughout.
Design is unattractive.
Level 2

Limited aesthetics
(shapes somewhat correctly cut)
Design and use of glue is messy at times.
Some visual appeal.
Glue use..messy
Level 3

Overall, an attractive bridge.
Tidy work most of the time.
Visually appealing.
Glue use is somewhat tidy.
Level 4

Extremely aesthetic in design
All constuction is clean and attractive.
Visually appealing.
Structure

Level 1

Does not meet the construction requirements (unstable or incomplete).
Did not maximize use of materials.
Bridge supports less than 5 lbs
Level 2

Meets the construction requirements, but remains unstable or incomplete in some way.
Limited use of materials.
Bridge supports 5-10 lbs.
Level 3

Meets the construction requirements and is complete, is complete and stable.
Good use of materials.
Bridge supports 10-15 lbs.
Level 4

Meets the construction requirements and is complete and stable.
Excellent use of materials.
Bridge supports greater than 15 lbs.
Work Ethic

Level 1

Used time poorly. Created a distracting work environment for team members.
No respect shown.
Level 2

Some effort to use time effectively.
Some respect shown.
Level 3

Effort given to use time effectively, but occasionally distracted from their project in some way.
Respect was observed most of the time.
Level 4

Actively involved in the building process with good focus and effort. All team members were treated with respect.
Design Constraints

- sketch
- description
- post building
reflection

Level 1

Bridge design does not match the design of the blueprint and changes were not explained.
Level 2

Bridge design somewhat matches the design of the blueprint.
If any changes were made during building, they were explained a little upon reflection.
Level 3

Bridge blueprint mostly matches the design of the finished product.
If any changes were made during building, they were sufficiently explained upon reflection.
Level 4

Bridge blueprint matches the design of the finished product.
If any changes were made during building, they were thoroughly explained upon reflection.



Keywords:
  • bridge, structures, forces, science, engineering


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n243