Skip to main content
iRubric: Pictures behind equations rubric

iRubric: Pictures behind equations rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Pictures behind equations 
Using variety of equations, please create a picture using equations. Use your TI-calculator to graph out the equations and present your creativity with your classmates.
Rubric Code: CCW99B
Ready to use
Public Rubric
Subject: Math  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Graphing Linear Equations
  Excellent

4 pts

Good

3 pts

Fair

2 pts

Poor

1 pts

Completeness

Excellent

The student graphed at least 10 lines with the given requirements
Good

The student graphed at least 8 lines with the given requirements
Fair

The student graphed at least 10 lines and only completed the requirements for at least 2 types of equations.
Poor

The student graphed less than 10 lines and did not satisfy the requirements for different types of slopes.
Equations

Excellent

The equation table is correctly completed for randomly selected 6 equations.
Good

The equation table is correctly completed for at least 4 equations
Fair

The equation table is correctly completed for at least 2 equations.
Poor

The equation table is filled in, and 6 lines are labeled, but slopes and equations are incorrect.
Final Presentation

Excellent

Final product is neat, and it is clear that the student took great care to turn in quality work. Student edited carefully for errors. No axes are present in the final picture.
Good

Final product is neat, and the student took care to turn in quality work. However, the student did not carefully edit for errors. Axes are present in the final picture.
Fair

Final product is messy in places, and the student took little care to turn in quality work. Student did not edit for errors.
Poor

Final product is overall messy, and it is clear the student did not take care to turn in quality work. Student did not edit for errors.
Handed In On Time

Excellent

Student handed in the Painting between the lines Project on time.
Good

Student handed in the Painting between the lines Project one day late.
Fair

Student handed in the Painting between the lines Project two days late.
Poor

Student handed in the Painting between the lines Project three or more days late.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98