Skip to main content
iRubric: Potholder Sewing Project rubric

iRubric: Potholder Sewing Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Potholder Sewing Project 
Rubric Code: U84B84
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Potholder Sewing Project
4 Squares sewn with a batting middle and a backing turned under for the edge finish.
  Poor

2 pts

Needs Improvement

4 pts

Satisfactory

6 pts

Excellent

8 pts

Machine Operation
1 pts

Enter description

Poor

The student has poor knowledge of sewing machine and needs help daily.
Needs Improvement

The student needs help with the sewing machine on most of the days.
Satisfactory

The student needs help with the machine some of the time.
Excellent

The students did not need help with the sewing machine and was able to help others.
Seams
1 pts

Poor

Seams are puckered or falling apart. They are wider/smaller than the instructions call for.
Needs Improvement

Seams are wider/smaller than what are called for in the instructions and not secured by back stitching. In some places correct sides of the fabric are together.
Satisfactory

Seams are a little/wider than what the instructions called for and are secured with back stitching. Seams are pressed open and turned under part of the time.
Excellent

Seams are correct in width and construction and pressed correctly. Correct sides of the fabric are together. Seams are pressed open and turned under correctly.
Appearance: Clean & Neat
1 pts

Poor

Assignment is not pressed, threads are not trimmed.
Needs Improvement

Assignment has a poor appearance.
Satisfactory

Assignment is clean and pressed but threads are not trimmed.
Excellent

Assignment is clean, pressed, and threads are trimmed.
Backing/Edges
1 pts

Poor

Fabric is not cut to the correct size. Edges are pressed but not turned under.
Needs Improvement

Fabric backing is cut evenly and pressed but edges have not correctly been turned under.
Satisfactory

Fabric backing is cut correctly and edges have been pressed and sewn.
Excellent

Fabric backing is cut correctly and edges have been pressed and sewn correctly.
Time Management
1 pts

Poor

The student did not finish the project by the due date and project is incomplete.
Needs Improvement

The student did not finish the project by the due date but project is complete.
Satisfactory

Project was turned in on time.
Excellent

Project was turned in early.
Clean Up
1 pts

Poor

The student did not help clean up their area.
Needs Improvement

The student only cleaned up their area when reminded.
Satisfactory

The student cleaned up their area.
Excellent

The student cleaned up room on daily basis and helped others.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16