Skip to main content
iRubric: Lamp Project rubric

iRubric: Lamp Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Lamp Project 
Using the Lathe students are to plan out and decide what shape they would like to make the wood piece for their lamp. When completed turning, sanded and drilled students are to wire up the lamp.
Rubric Code: HX762X7
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: Undergraduate

Powered by iRubric Enter rubric title
  Poor

1 pts

Fair

3 pts

Good

5 pts

Plan Following

Poor

Plan was only glanced at and not used as a guide for project.
Fair

Plan was used for construction of project but was not followed step by step.
Good

Plan was used for construction of project and was thoroughly followed during construction.
Project Appearance

Poor

Finished project looked sloppy. Not much care put into finishing work (I.E. sanding, painting, etc.)
Fair

Finished project looked fair. Room for improvement was seen in paint, sanding, etc.
Good

Finished project looked excellent and rounded out. Decoration and construction looked very desirable.
Time spent on project

Poor

No time was spent constructing project.
Fair

Some time was spent constructing project.
Good

Extra time was spent on project to ensure a desirable outcome.
Practicality and ease of use

Poor

Project was not practical and as such was hard to use
Fair

Project was practical but hard to use.
Good

Project was practical and had ease of use
Creativity of project

Poor

Project showed no signs of creative planning.
Fair

Project was creative in decoration but not design.
Good

Project was creative in design and decoartion.
Sanding

Poor

Why do you have to sand? It looks perfect just the way it is!
Fair

Project only made it as far as 150-220 grit sandpaper.
Good

Project was smooth as a babies bottom.
Used 600 grit to complete.
Wiring

Poor

Why do I have to wire it. It looks perfect just the way is. is.
Fair

Project had not been drilled properly and the wiring was off to the side.
Good

Wiring was done well and the project wiring was centered.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16