Skip to main content

iRubric: Projet personel rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Art projects without a specific rubric or other assessment criteria will be evaluated and graded using the following rubric.
Rubric Code: ZX99B47
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: (none)

Powered by iRubric Project
  Extraordinary

4

(N/A)

Above average

3

(N/A)

Average

2

(N/A)

Poor

1

(N/A)

Understanding
20 %

Demonstrartion that instructions and included a detailed rough draft.

Extraordinary

The artwork is planned carefully; very detailed rough draft.
Above average

The artwork is planned carefully; some details in the rough draft.
Average

The art work had little planning; very basic rough draft
Poor

That are work was not planned; no rough draft.
Craftsmanship/ Skill
20 %

Neatness, precision, care.

Extraordinary

The artwork shows outstanding craftsmanship,with clear attention to detail,
Above average

The artwork shows good craftmanship, with some attention to detail.
Average

The artwork shows average craftmanship and attention to detail.
Poor

The artwork shows poor craftmanship and no attention to detail.
Creativity/ Originality
20 %

Inventiveness, expression of ideas and imagination.

Extraordinary

The artwork demonstrates original personal expession and outstanding problem solving skills.
Above average

The artwork demonstrates some personal expression and logical problem solving skills.
Average

The artwork demonstrates an average amount of personal expression.
Poor

The artwork lacks evidence of personal expression.
Effort
20 %

What it takes to finish the project as well as possible, time dedicated to the project inside and/or out of class.

Extraordinary

The student put forth extraordinary effort to complete the project well as possible; used class time extremely well.
Above average

The student put forth the effort required to complete the project well; used class time well.
Average

The student put forth the effort required to finish the project; used class time adequately.
Poor

The student put forth no effort or the project was not completed; class time was not used well.
Cooperation
20 %

Attitude during class time; willingness to complete set up, art practice and clean up tasks.

Extraordinary

The student is always willing to complete assigned tasks and help set up and clean up projects; works very well with others and makes the most use of studio time.
Above average

The student is usually willing to complete assigned tasks and help set up and clean up projects; works well with others and utilizes the studio time.
Average

The student is sometimes willing to complete assigned tasks and help set up and clean up projects; works somewhat well with others and uses minimum amount of studio time.
Poor

The student does not show willingness to complete assigned tasks and help set up and clean up projects; does not work well with others.



Keywords:
  • Art work


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n243