Skip to main content

iRubric: Switching and Receptacle Wiring rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Switching and Receptacle Wiring 
Students wil select proper material and install wiring following National Electrical Code requirements while following safe work practices in a predetermined time.
Rubric Code: Z25W4C2
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Residential Wirining
  Needs Improvement

50 pts

Bellow Basic

70 pts

Basic

80 pts

Competant

90 pts

Advanced

95 pts

Box Mounting

Needs Improvement

One of Five of the excellent requirements
Bellow Basic

Two of Five of the excellent requirements
Basic

Three of Five of the excellent requirements
Competant

Four of Five of the excellent requirements
Advanced

Boxes locations per drawing, box height as per requirements, boxes properly fastened, proper depth on stud, proper clamps
Installation of Wiring

Needs Improvement

One of Five of the excellent requirements
Bellow Basic

Two of Five of the excellent requirements
Basic

Three of Five of the excellent requirements
Competant

Four of Five of the excellent requirements
Advanced

Proper wire length in box, 1/4" jacket passed clamp/anti short bushing, stapling, 1 1/4" physical protection, professional termination in panel
Installation of Devices

Needs Improvement

One of Five of the excellent requirements
Bellow Basic

Two of Five of the excellent requirements
Basic

Three of Five of the excellent requirements
Competant

Four of Five of the excellent requirements
Advanced

Eyes clockwise, terminal eyes clean and professional, grounding, clean splices, neat and workman-like manner
Operation

Needs Improvement

One of Five of the excellent requirements
Bellow Basic

Two of Five of the excellent requirements
Basic

Three of Five of the excellent requirements
Competant

Four of Five of the excellent requirements
Advanced

Light operates properly, 3 way/4 way switch system operates properly, GFCI operates properly, receptacle operates properly, proper overcurrent protection
Time to complete

Needs Improvement

Complete project in 2 hours, 30 minutes
Bellow Basic

Complete project in 2 hours, 15 minutes
Basic

Complete project in 2 hours
Competant

Complete project in 1 hour, 45 minutes
Advanced

Complete project in 1 hour, 30 minutes




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n203