Skip to main content

iRubric: Arch Construction Lab Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Arch Construction Lab Project 
Rubric for scoring the construction of an arch using unconvetional materials (Starbursts and frosting)
Rubric Code: PXW836A
Ready to use
Public Rubric
Subject: Engineering  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Arch project
  Beginning

1 pts

Developing

2 pts

Achieving

3 pts

Excelling

4 pts

Measurement

Beginning

No attention to measurements and student(s) are unable to articulate the relationship to structural integrity.
Developing

Minor measurement errors, student(s) are unable to articulate the relationship to structural integrity.
Achieving

Measurements of arch are accurate and student(s) understand, but are unable to articulate the relationship to structural integrity.
Excelling

Measurements of arch are accurate and student(s) understand and can articulate the relationship to structural integrity.
CooperativeLlearning

Beginning

Both student participate, roles are not defined, and students do not work cooperatively.
Developing

Both student participate, roles are not defined, but students attempt to work cooperatively.
Achieving

Both student participate, have roles and work cooperatively.
Excelling

Both student participate, have roles, and work cooperatively in support of the overall goal of the project.
Observable Planning

Beginning

Little care and no layout done in assembly of project.
Developing

Minor errors in assembly and no initial layout done.
Achieving

No visible errors in assembly and initial layout completed.
Excelling

No visible errors in assembly and initial layout completed.
Building Process

Beginning

Students did not discuss construction issues during building phase and made no adjustments.
Developing

Students discussed construction issues during building phase and made no adjustments to meet objectives of the project.
Achieving

Students discussed construction issues during building phase and made adjustments that did not meet the objectives of the project.
Excelling

Students discussed construction issues during building phase and made adjustments that met the objectives of the project.
Finish

Beginning

Project built as instructed with frosting covering the outside of the "bricks" (Starburts).
Developing

Project built as instructed with frosting very noticable on the outside of the "bricks" (Starburts).
Achieving

Project built as instructed with some frosting noticable on the outside of the "bricks" (Starburts).
Excelling

Project built as instructed with little to no frosting noticable on the outside of the "bricks" (Starburts). Neat!










Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n224