Skip to main content

iRubric: Sculpture General Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Sculpture General Rubric 
This is a general rubric for sculpting projects
Rubric Code: PXC93X2
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: 9-12

Powered by iRubric sculpture
  Level 4

9 pts

Level 3

7 pts

Level 2

6 pts

Level 1

5 pts

R / Below Level

2 pts

Design

Level 4

The design of the project is excellent.

The difficulty of the design pushes the boundaries of the Craftsperson OR perfectly fit the project prompt.
Level 3

The design of the project is strong.

The difficulty of the design begins to push the bounds of the craftsperson OR matches the prompt well
Level 2

The design of the project begins to fall short.

The difficulty of the design is not quite challenging enough for the level of the student OR makes some attempt to meet the prompt.
Level 1

The design of the project lacks for-thought.

The difficulty of the design is not challenging enough for the level of the craftsperson OR the design level falls well short of the project prompts.
R / Below Level

Little to no consideration was placed on the design.

The difficulty of the design is not suited to the level of the craftsperson OR the design does not reflect the prompt.
Construction

Level 4

The construction of the various components of the project were carefully crafted with a very high level of precision.
Level 3

The construction of the various components of the project are fairly well crafted.

The overall appearance of the piece is very strong.
Level 2

The construction of the various components of the project are not as carefully crafted as required.

The lack of precision begins to detract from the product.
Level 1

The construction of the various components of the project are poorly crafted

The lack of precision detracts from the look of the product.
R / Below Level

The construction of the various components of the project are haphazardly crafted with little thought to the overall look.

The lack of precision greatly detracts from the look of the product.
details and craftsmanship

Level 4

The project's finish (the sanding, polishing, painting/ varnish/lacquer/etc.) is done in an impeccable way.

The overall appearance of this piece is flawless.
Level 3

One of the following criteria needs improvement. (the sanding, polishing, painting/ varnish/lacquer/etc.)

The overall appearance of the piece is very strong.
Level 2

One of the following criteria needs improvement. (the sanding, polishing, painting/ varnish/lacquer/etc.)

The overall appearance of the piece is good, but could be refined.
Level 1

The project was complete but had less than satisfactory attention paid to the finish (the sanding, polishing, painting/ varnish/lacquer/etc.)The overall appearance of the piece is approaching expectations.
R / Below Level

Student did not complete project in time period given, refused to start project or abandoned project once started.
Application of Safety Practices

Level 4

Student followed all safety rules.
Level 3

Student followed most safety rules, may have forgotten one.
Level 2

Student attempted to follow safety rules but failed to meet several.
Level 1

Student failed to follow a significant number of safety rules.
R / Below Level

Student was not safe enough to enter/ participate in class
Proper use of material

Level 4

Material was aptly chosen and treat with care.
Level 3

Material was appropriate for the project. little material was mistreated or poorly used.
Level 2

Material was occasionally wasted or chosen poorly for the projects purposes.
Level 1

Little though was put into the choice of material, and material was squandered.
R / Below Level

Material was often chosen poorly for the project, and was usually squandered.
Time Management

Level 4

Routinely used time well throughout the project to get the job done on time.
Level 3

Used time fairly well throughout the project.
Level 2

Procrastinated somewhat but did get the job done on time.
Level 1

Was unable to adequately meet timeline due to inablility.
R / Below Level

Student showed no interest in completing project on time.
Clean up

Level 4

Student routinely followed through on their daily clean up assignment.
Level 3

Student mostly followed through on daily clean up.
Level 2

Student performed their required clean up duites more than 50 percent of the time, but less than 75 percent of the time.
Level 1

Student performed their required clean up duites less than 50 percent of the time.
R / Below Level

Student did not perform their clean up duties.
ideating

Level 4

The concept was very apt and well thought out. the material reflects the vision of the piece.
It is inventive and unique
Level 3

The concept is strong and well thought out. Very creative and original
Level 2

the concept is fair but lacks some clarity. The piece may show some originality.
Level 1

the concept lacks originality, and the message is vague or little thought was focused upon it.
R / Below Level

Little to no effort was focused on the concept, and the piece shows no original spin on an existing idea.










Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n224