Skip to main content

iRubric: Wall Framing - Group Build Assignment rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Wall Framing - Group Build Assignment 
Wall Framing - Basic. Students will be able to frame a wood built wall according to plans. Keywords: PPE, dimension, discrepancy, flush, alignment, shiner, stud, plate, component.
Rubric Code: KX5B493
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Wall Framing
100 %
  Falls Far Below

0 pts

Approaches

From (1-30)

30 pts

Meets

From (31-40)

40 pts

Exceeds

From (41-50)

50 pts

Total

(N/A)

Safety & Tool Use
10 %

Falls Far Below

Safety glasses and other PPE come off even once during project. Work area is cluttered and tools are not used properly or put back properly.
Approaches

All necessary PPE is worn at all times. Work area is kept free of major obstacles, but scraps and unneeded tools are left out. Tools are used improperly more than once.
Meets

All necessary PPE is worn at all times. Work area is usually kept clutter free; scraps and unneeded tools are put away fairly quickly. Tools are always used properly and placed in their proper area.
Exceeds

All necessary PPE is worn at all times. Work area is kept clutter free; scraps and unneeded tools are put away immediately. Tools are always used properly and placed in their proper area.
Total
Level & Squareness of Frame
30 %

Falls Far Below

A discrepancy of more than 1/2" exists between diagonals and more then a half bubble out of level
Approaches

A discrepancy of 1/2" or less exists between diagonals and less then a half bubble out of level
Meets

A discrepancy of 1/4" or less exists between diagonals and less then a 1/4 bubble out of level
Exceeds

A discrepancy of 1/8" or less exists between diagonals and the frame is level.
Total
Dimensions
30 %

Falls Far Below

One or more of the dimensions is off by MORE THAN 1/2". Length, width, height, etc.
Approaches

One or more of the dimensions is off by 1/2" or less. Length, width, height, etc.
Meets

One or more of the dimensions is off by 1/4" or less. Length, width, height, etc.
Exceeds

All dimensions of the frame are 1/8" or less. Length, width, height, etc.
Total
Structure and Appearance
20 %

Falls Far Below

Has excessive gaps, damages, raised nails, and lacks alignment. The frame is not
Approaches

Has three or more components are out of flush.
Meets

No more than two components are out of flush.
Exceeds

All components are flush. There are no gaps between studs and plates larger than 1/8".
Total
Components
10 %

Falls Far Below

Any of the component requirements are not evident or are out of position by 1/2" or more.
Approaches

Studs are placed within 1/2" of specified spacing.
Meets

Studs are placed within 1/4" of specified spacing.
Exceeds

Studs are placed within 1/8" of specified spacing.
Total



Keywords:
  • PPE, dimension, discrepancy, flush, alignment, shiner, stud, plate, component

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n224