Module Wall Framing 
Rubric Code: GC2636
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Module Wall Framing Rubric
100 % This rubric will break down your team's score for the modules we are building in lab. Please make sure you read and understand each category and how you will be graded.
  Not In Compliance

0 pts

Poor

4 pts

Fair

7 pts

Good

9 pts

Excellent

10 pts

Project Completion Time
10 %

You will be graded on your timeliness in completing this project using the criteria in these columns.

Not In Compliance

Did not complete project within 3 days of the deadline.
Poor

Project is completed 2 days after the deadline.
Fair

Project is completed 1 day after the deadline.
Good

Project is completed after the deadline but on the same day as the deadline.
Excellent

Completed project by the deadline or early.
Teamwork
30 %

It is essential that each team member stay working. Remember the whole group gets the same grade so encourage each other to stay busy. Also included is foreman performance and team listening to foreman.

Not In Compliance

Team members needed reminded more than 5 times during the project to stay working.
Poor

Team members needed reminded no more than 5 times during the project to stay working.
Fair

Team members needed reminded no more than 4 times during the project to stay working.
Good

Team members needed reminded no more than 2 times during the project to stay working.
Excellent

All members stayed busy and needed no reminders to stay working.
Project Walls Plumb
10 %

Plumb walls are a must for building a sturdy structure. You will be graded on how well you plumb the walls using the criteria in these columns.

Not In Compliance

Project constructed with no walls being plumb
Poor

Project constructed with 1 wall plumb
Fair

Project constructed with 2 walls plumb.
Good

Project is constructed with 3 walls plumb
Excellent

Project is constructed with all 4 walls plumb
Stud Layout
10 %

Stud layout is essential for proper installation of exterior sheathing and interior drywall. The columns indicate the expected tolerances.

Not In Compliance

1 or more studs are off layout by more than 1/2"
Poor

1 or more studs are off layout by a maximum of 1/2"
Fair

1 or more studs are off layout by a maximum of 1/4"
Good

1 or more studs are off layout by a maximum of 1/8"
Excellent

Project is constructed with all studs in all walls being on specified layout.
Squareness
10 %

Walls have to be square for the building to come together correctly. The columns give tolerances for this part of your grade.

Not In Compliance

Project is constructed with 1 or more walls being out of square by more than 1/2"
Poor

Project is constructed with 1 or more walls being out of square by a maximum of 1/2"
Fair

Project is constructed with 1 or more walls being out of square by a maximum of 1/4"
Good

Project is constructed with 1 or more walls being out of square by a maximum of 1/8"
Excellent

Project is constructed with all walls being square.
Window Framing
10 %

It is essential for window openings to be correct for proper window fit. Openings need to be the correct size, plumb, level, square, and have proper headers.

Not In Compliance

Window framing has more than 3 errors.
Poor

Window framing has no more than 3 errors.
Fair

Window framing has no more than 2 errors.
Good

Window framing has no more than 1 error.
Excellent

All window framing is correct including plumb, level, square, and proper headers.
Door Framing
10 %

Door framing is also essential for proper door fit. Openings need to be the proper size, plumb, level, square and have proper headers.

Not In Compliance

Door framing has more than 3 errors.
Poor

Door framing has no more than 3 errors.
Fair

Door framing has no more than 2 errors.
Good

Door framing has no more than 1 error.
Excellent

All door framing is correct including plumb, level, square, and proper headers.
Project Appearance
10 %

Every project we do should be of utmost appearance. We don't want any defects in the appearance of our work. The following columns give the tolerances for this project.

Not In Compliance

Project is completed with more than 6 problems with appearance.
Poor

Project is completed with no more than 6 problems with appearance.
Fair

Project is completed with no more than 5 problems with appearance.
Good

Project is constructed with no more than 3 problems with appearance.
Excellent

Project is completed with a pleasing appearance with no bent studs, studs out of flush, missing studs, or anything that detracts from the appearance of the project.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n58