Skip to main content

iRubric: Art Assessment for General Project Production rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Art Assessment for General Project Production 
A rubric that properly evaluates the artistic process. It measures the various phases and approaches that are necessary in the assessment of a project or a work of art.
Rubric Code: F3AB64
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: (none)

Powered by iRubric Art Project
General Art Asessment
  ADVANCED

4 pts

PROFICIENT

3 pts

BASIC

2 pts

BELOW BASIC

1 pts

Instruction & Concepts
4 pts

Level of understanding about instructions and concepts (elements and principles of art) used in project.

ADVANCED

The artwork is planned carefully; understanding of all concepts and instructions is clearly demonstrated. Student can identify all complementary colors and define geometric shapes.
PROFICIENT

The artwork is planned carefully; understanding of most concepts and instructions is demonstrated.Student can identify one or two complementary colors and define geometric shapes.
BASIC

The art work is planned adequately; understanding of some concepts and instructions demonstrated. Students can identify one complementary colors and can give a general statement about geometric shapes.
BELOW BASIC

The artwork shows little evidence of understanding the concepts and instructions. Student can not identify complementary colors or geometric shapes.
Behavior/Effort
4 pts

Work ethic; the time dedicated to the project inside and/or out of class.

ADVANCED

The student put forth extraordinary effort to complete the project well as possible; used class time extremely well.
PROFICIENT

The student put forth the effort required to complete the project well; used class time well.
BASIC

The student put forth the effort required to finish the project; used some class time adequately.
BELOW BASIC

The student put forth little effort required to finish the project; class time was not used well.



Keywords:
  • Art work, art project, art assessment


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n243