Skip to main content

iRubric: Sewing Project Evaluation Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Sewing Project Evaluation Project 
Rubric Code: EA446B
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Sewing Project Rubric
  Failure

0 pts

Needs Improvement

16 pts

Good

26 pts

Excellent

36 pts

Seams

Failure

Student did not turn project in
Needs Improvement

Seams are puckered. They are wider than what the instructions called for.
Good

Seams are wider than what are called for in the instructions. In some places correct sides of the fabric are together.
Excellent

Seams are correct in width and construction. Correct sides of fabric are together
Stitches

Failure

Student did not turn project in
Needs Improvement

Stitch length is not correct or consistent and tension is too tight or too loose.
Good

Stich length is correct, but tension is too loose or too tight at times
Excellent

Stitch length is correct and tension is perfect
Cutting

Failure

Student did not turn project in
Needs Improvement

Cutting lines are not straight and trimmed seams are uneven
Good

Cutting lines are straight and most of trimmed seams are even
Excellent

All cutting lines are straight and trimmed seams are all even
Neatness/Clean

Failure

Student did not turn project in
Needs Improvement

Project looks dirty or stained and shows evidence of finger prints
Good

Project is clean, but shows evidence of finger prints
Excellent

Project is clean and shows no evidence of finger prints
Threads

Failure

Student did not turn project in
Needs Improvement

Threads were not trimmed during the sewing process
Good

Some threads were not trimmed during the sewing process
Excellent

All threads were not trimmed during the sewing process
Backstitching

Failure

Student did not turn project in
Needs Improvement

Seams were not backstitched during the construction process
Good

Most seams were not backstitched during the construction process
Excellent

All seams were not backstitched during the construction process
Time Management

Failure

Student did not turn project in
Needs Improvement

Project was turned in late (after the due date)
Good

Project was turned in on time
Excellent

Project was turned in early.





Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n224