Skip to main content

iRubric: Construction Unit Scale Model Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Construction Unit Scale Model Project 
Rubric use to assess student process and performance completing a scale model construction project and typed paper
Rubric Code: D764W3
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Construction- Grading Skills
  Excellent

5 pts

Good

4 pts

Fair

3 pts

Undeveloped

2 pts

Non-Compliance

1 pts

Grade Received

(N/A)

Job Completion
20 %

Excellent

The project was 100% complete and worked according to the task description.
Good

The project was complete and worked, but needed minor modifications. Only required 2-3 reclarifications.
Fair

The project was complete but did not work; needed several minor modifications. Required more then 3 reclarifications of task but didn't impact others around him to do task severly.
Undeveloped

The project was complete but did not work; needed several major modifications.
Non-Compliance

Student did not complete project in time period given, refused to start project or abandoned project once started.
Grade Received
Demonstrate Knowledge of Process
10 %

Excellent

Student knows and is able to identify and explain necessary theories/ task for completion of the project. Relies on own memory skills to get task done.
Good

Student is able to identify and explain necessary theories/ task for completion of the project with some assistance. Uses own words to describe task.
Fair

Student is unable to identify or explain concepts without major prompting. Requires adult assistance to get job done. Uses very little vocabulary to describe the task.
Undeveloped

Student is not able to both identify and explain major theories/task. Uses others views to explain the task and doesn't complete task on own for any of steps.
Non-Compliance

Student lacked interest in demonstrating knowledge of project and/or process.
Grade Received
Student Preparedness
10 %

Excellent

Student had/gathered all materials and was completely ready to go to work.
Good

Student had/gathered most materials and went to work.
Fair

Student had/gathered most materials, however, they needed excess time to do so.
Undeveloped

Student did not have/gather some of the needed materials to perform work.
Non-Compliance

Student refused to gather materials required to complete the project.
Grade Received
Time Management
10 %

Excellent

Routinely used time well throughout the project to get the job done on time.
Good

Used time fairly well throughout the project.
Fair

Procrastinated somewhat but did get the job done on time.
Undeveloped

Was unable to adequately meet timeline due to inablility.
Non-Compliance

Student showed no interest in completing project on time.
Grade Received
Student Attitude During Project
10 %

Excellent

Student turned in a project they considered a reflection of their diligent efforts.
Good

Student turned in a project they are pleased with.
Fair

Student turned in a project that is semi-decent to receive a fair grade.
Undeveloped

Student turned in project simply to receive credit.
Non-Compliance

Student refused to complete project
Grade Received
Mathematical Calculations
15 %

Excellent

Student was able to calculate all three mathematical values. No errors were found in their calculations.
Good

Student was able to calculate all three mathematical values, but there were errors in the calculations.
Fair

Student was able to calculate two of the three mathematical values, but there were errors in the calculations.
Undeveloped

Student was able to calculate at least one of the three mathematical values. Major errors in their calculations.
Non-Compliance

Student was not able to calculate the mathematical values of volume, surface area, or scale factor of the scale model.
Grade Received
Paper Length
5 %

Excellent

Student did turn in a paper that was at least 1 page in length.
Good

Student did turn in a typed paper that was 3/4 of a page in length.
Fair

Student did turn in a typed paper that was 1/2 of a page in length.
Undeveloped

Student did turn in a typed paper that was 1/4 of a page in length.
Non-Compliance

Student did not turn in a typed paper or student turned a hand written paper.
Grade Received
Paper Content
20 %

Excellent

Student demonstrated mastery of mathematical concepts of volume, surface area, and scale factor as indicated in the paper. Student also made strong connections between the structure's historical and cultural significance and its construction.
Good

Students demonstrated limited understanding of the mathematical concepts. Some connections were made between the structure's historical and cultural significance and its construction.
Fair

Students demonstrated a basic understanding of the mathematical concepts. Very few connections were made between the structure's historical and cultural significance and its construction.
Undeveloped

Students demonstrated a basic understanding of the mathematical concepts. No connections were made between the structure's historical or cultural significance and its construction.
Non-Compliance

Student did not demonstrate any understanding of the mathematical concepts. No historical or cultural significance was mentioned in the paper.
Grade Received










Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n243