Skip to main content
iRubric: Bridge Design Challenge rubric

iRubric: Bridge Design Challenge rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Bridge Design Challenge 
Rubric Code: A24X95A
Ready to use
Public Rubric
Subject: Science  
Type: Assessment  
Grade Levels: K-5, 6-8

Powered by iRubric Bridge Design Challenge
  1

(N/A)

2

(N/A)

3

(N/A)

4

(N/A)

Strength (Live Load)

1

The bridge is not structurally sound and can only hold between 0 and 2 lbs of live load prior to collapsing.
2

The bridge is somewhat structurally sound but can only hold between 2 and 4 lbs of live load prior to collapsing.
3

The bridge is structurally sound and can hold between 4 and 5 lbs of live load.
4

The bridge is obviously very structurally sound and can hold 5 lbs or more of live load.
Wind Resistance

1

The bridge is not sturdy and collapses when a fan on high speed is placed 2 feet away.
2

The bridge is somewhat sturdy and has noticeable movement when a fan on high speed is placed 2 feet away.
3

The bridge is sturdy and only moves slightly when a fan on high speed is placed 2 feet away.
4

The bridge is very sturdy and does not move even when a fan on high speed is placed 2 feet away.
Design

1

The bridge span is less than 15cm and is minimally constructed of geometric shapes, which are not placed in logical and symmetrical positions.
2

The bridge span is 15-25cm and is somewhat constructed of geometric shapes, although they may not be placed in logical and symmetrical positions.
3

The bridge span is 25-30cm and is mostly constructed of geometric shapes placed in logical and symmetrical positions.
4

The bridge span is a minimum of 30cm and is constructed of geometric shapes placed in logical and symmetrical positions.
Visual Appeal

1

The bridge is not visually appealing. Limited time and effort has been put into the planning and execution of the completed bridge, and there is no unity across the overall design.
2

The bridge is somewhat visually appealing. Some time and effort has been put into the planning and execution of the completed bridge, although there are parts that appear to not match the overall design.
3

The bridge is visual appealing. Time and effort has been put in to the planning and execution of the completed bridge.
4

The bridge is very visual appealing. Time and effort has clearly been put in to the planning and execution of the completed bridge.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16