iRubric: Adaptive Device Prototype rubric

iRubric: Adaptive Device Prototype rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Adaptive Device Prototype 
This is an Adaptive Tech Prototype rubric for Middle School Students
Rubric Code: W2439BC
Ready to use
Public Rubric
Subject: Engineering  
Type: Assessment  
Grade Levels: 6-8, 9-12

Powered by iRubric Prototyping
  Exemplary

10 pts

Accomplished

7 pts

Developing

4 pts

Unacceptable

0 pts

Drawings & Documentation

2D - Front, Top, & Right views

Exemplary

Drawings and specifications are organized, detailed, complete, and furnished
All component and related assembly drawings are complete.
The parts and materials list is complete.
Material evaluation is clear, and choice is supported by evidence
Scale is consistent
Lines are crisp and symmetrical
Accomplished

Drawings and specifications are furnished. Component drawings are complete; assembly drawings may or may not be finished.
Parts and materials list complete
Most lines are crisp
Materials are explained with pros and cons
Developing

Hand drawn sketches, layouts and assemblies drawn to a common scale. Most critical dimensions specified.
Partial parts and materials list.
Unacceptable

Rough hand drawn sketches with little or no dimensioning. No assembly or system drawings or layouts.
No parts or materials list.
Fit & Function

Exemplary

Component mock-ups or rapid prototype models are used to validate component fit or function prior to prototype construction.
The mechanics of the device are explained/ illustrated. The mock-up matches the drawings exactly.
The scale of the drawings matches the prototype
The device works or would work as designed, meeting all constraints
Accomplished

Simple tests are developed and carried out to validate fit or function prior to prototype construction.
Function is clearly represented in prototype
Prototype closely resembles sketches
Device would meet 2/3 of constraints
Developing

Prototype construction is complete
Device would meet 1/2 constraints
Unacceptable

No attempt is made to determine if component will perform as envisioned prior to prototype construction.
Material / Component Selection

Exemplary

Material or component options are thoroughly researched and compared for best fit to design requirements.
Accomplished

Research conducted to determine a suitable fit for design requirements. Possible alternatives are specified.
Materials used directly correlate to intended real-world materials and are clearly marked
Developing
Unacceptable
Manufacturing Process Plan

Exemplary

The device completed 100% on time
Accomplished

90% of device completed.
Developing

Device 50% incomplete
Unacceptable

The device is less than 50% incomplete.
Product Quality Workmanship

Exemplary

Finished prototype is well constructed, shows attention to detail, and is fabricated accurately to specifications
Accomplished

Finished prototype is of acceptable quality, shows some attention to detail and is fabricated accurately to specifications.
Developing

Finished prototype hastily constructed , shows minimal attention to detail some aspects/dimensions do not match specifications
Unacceptable

No physical prototype constructed.



Keywords:
  • EDP, prototyping, Adaptive Tech

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98