0 pts
1 pts
2 pts
3 pts
4 pts
5 pts
Basic free hand sketch drawn proportionally 7 accurately prior to measuring. Envelope materials & site conditions noted, Measured and recorded. Structural elements & structural grid noted. Essential services noted. Floors, walls 7 ceiling materials noted All changes of level indicated. Field sketches readable & coherent
Correctly observed and drawn, all heights dimensioned, and noted
Construction joints Fire hydrants Emergency switches Loose furniture or other equipment
Drawings in correct order on sheet, sheets, labeled correctly.
0.5 pts
1.5 pts
2.5 pts
Shows all relevant dimensions. Indicates materials, construction joints, structure, levels. Doors, windows & other openings noted
Correctly referenced, observed & drawn, dimensioned, & noted. Including: wall & ceiling heights, window sills & window head heights. Skirting type & dimensions . Ceiling heights noted
Line work, writing style, presentation
Correct units & scale noted