Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Shape and Color with Piet Mondrian/Math combined curriculum rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Shape and Color with Piet Mondrian/Math combined curriculum
Shape and Color with Piet Mondrian
Students created their own versions of a Piet Mondrian's Composition in Red, Blue and Yellow by using coloured markers, and black sharpie markers to make various sizes of rectangles and squares. Shapes chosen from the factors of 4 whole numbers.
Rubric Code:
VX8CA25
By
Ericatreacher
Ready to use
Public Rubric
Subject:
Arts and Design
Type:
Assessment
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Piet Mondrian Art
Not Yet
1 pts
Basic
2 pts
Good
3 pts
Excellent
4 pts
Lines
Not Yet
Student did not use a ruler to make horizontal and vertical lines with a pencil and then black sharpie marker.
Basic
Student used a ruler for pencil lines, but not for lines with black sharpie marker or did not go over lines with a marker
Good
Most of the lines are straight and done with a ruler
Excellent
Every line is sharp and black and made with a ruler.
Primary Colors
Not Yet
Student used non-primary colours and the colours have other colours bled into them
Basic
Student used one color that wasn't a primary color or the colours bled into each other
Good
Student used only primary colors. (Red, Yellow, and Blue).
Excellent
Student used only primary colours, plus used black and left white spaces.
Shapes
Not Yet
Not all rectangles or squares
Basic
Shapes are not square-some of the lines are crooked and thus the shapes are not square.
Good
Shapes are squares or rectangles
Excellent
Shapes are a selection of squares and rectangles based on the factors found in 4 selected whole numbers.
Effort
Not Yet
The art is not finished
Basic
The art is poorly finished; the work is untidy and rushed
Good
The art is finished and tidy and some time has been put into the work
Excellent
The art is finished and completely clean. A lot of time was put into drawing and colouring the piece. Every shape is coloured in full. Ruler used for every line.
Math connection
Not Yet
2 whole numbers with errors. Many missing factors.
Basic
3 whole numbers used and/or factors missing.
Good
4 whole numbers with 2 or more factors missing.
Excellent
4 whole numbers with all factors listed.
Keywords:
visual art
Subjects:
Arts and Design
Types:
Assessment
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Arts and Design rubrics
More Assessment rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n16
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.