Skip to main content

iRubric: Tasking Evaluation Rubric

find rubric

(draft) edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Tasking Evaluation Rubric 
Operational time distrubution
Rubric Code: U563CX
Draft
Public Rubric
Subject: Engineering  
Type: Assignment  
Grade Levels: Graduate

Powered by iRubric Enter rubric title
1 % Enter rubric description
  Poor

1 pts

Fair

2 pts

Good

3 pts

TOC Manager
1 pts

Requirement for BFT monitoring and management of the installation and provisions

Poor

Performs 2.5 hours of less per 12 hour period
Fair
Good
Enter title
1 pts

Enter description

Poor
Fair
Good
Enter title
1 pts

Enter description

Poor
Fair
Good



Keywords:
  • TOC OPS

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to ready to use.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n243