The plan shows all the required rooms. The main floor as well as the bathroom. Top plates are doubled.
Doors are added to room openings (unless otherwise stated). Windows were added to the project. They are constructed with proper headers, sills and trimmer studs.
The floor is properly made, with joists properly spaced. The subfloor has been added and the lines to show them have been drawn.
The walls are accurately made, studs are properly placed, top plates are doubled.
Roof trusses are properly constructed, spaced properly, and have correct dimensions.
Work was evenly shared between partners, group members stayed on task and focused on the project at hand.