Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Paper Bridge rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Paper Bridge
Paper Bridge
Students are to work alone or in teams and build a 3 in wide paper bridge and spans a gap of 20 cm and holds a as many pennies as possible before collapsing.
Rubric Code:
FX88562
By
kyliefisher
Ready to use
Public Rubric
Subject:
Science
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Forces Acting on Structures:
Level 1
(N/A)
Level 2
(N/A)
Level 3
(N/A)
Level 4
(N/A)
Appearance
Level 1
Work is sloppy throughout.
Design is unattractive and/or plain.
Level 2
Design and use of tape is messy at times.
Some visual appeal.
Level 3
Overall, an attractive bridge
Tidy work most of the time.
Multiple versions of the same bridge.
Level 4
Extremely attractive in design
All construction is clean and attractive.
Unique design
Structure
Level 1
Basic use of beam, arch, truss, corrugation shows limited understanding of structures and forces
No Design
Level 2
Use of beam, arch, truss, corrugation shows some understanding of structures and forces
More than 2 cm short of minimum 20 cm span requirement
More than 1 inch narrower than 3 inch width requirement
Level 3
Use of beam, arch, truss, corrugation shows good understanding of structures and forces
1 to 2 cm short of minimum 20 cm span requirement
.5 - 1 inch narrower than 3 inch width requirement
Level 4
Use of beam, arch, truss, corrugation shows excellent understanding of structures and forces
Meets minimum 20 cm span requirement
Meets 3 inch width requirement
Mass Held
Level 1
Supported less than 50% of the average mass that caused collapse
Level 2
Supported 51% to 75% of average mass that caused collapse
Level 3
Supported 76% to 100% of average mass that caused collapse
Level 4
Supported 100% of average mass and still standing
Keywords:
Bridge, structures, forces, science, engineering
Subjects:
Science
(General)
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Science rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n16
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.