Skip to main content
iRubric: Drawing with a Grid rubric

iRubric: Drawing with a Grid rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Drawing with a Grid 
Draw artwork/line drawing of a photo image provided using grid lines to reproduce appropriately to proper scale and proportion.
Rubric Code: JXX73X5
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: Undergraduate

Powered by iRubric Upside Down Grid Drawing
  Making Progress

6 pts

Meetins Expectation

8 pts

Excels Expectation

10 pts

Grid Lines

Making Progress

Did not use grid system accurately.
Meetins Expectation

Mostly used grid system correctly.
Excels Expectation

Drawn using the correct grid line placement.
Proportion and Scale

Making Progress

Size relationship is drawn incorrectly in relation to original artwork.
Meetins Expectation

Mostly correct in proportion to original artwork.
Excels Expectation

Close to perfection in proportion to original artwork.
Outline / Contour Line

Making Progress

Line is inconsistent in relation to original artwork with multiple breaks in the outline.
Meetins Expectation

Outline is mostly correct in relation to original artwork.
Excels Expectation

Outline is clearly established in relation to original artwork.
Detail

Making Progress

Did not attempt to draw details inside of contour line.
Meetins Expectation

Attempted to draw details and/or more details needed.
Excels Expectation

Details were drawn inside contour line to almost perfection.
Eraser Marks

Making Progress

Did not attempt to erase mistakes.

Sloppy work.
Meetins Expectation

Attempted to erase most pencil marks / mistakes.

Fairly clean.
Excels Expectation

Pencil marks / mistakes clearly erased.

Very clean.
Time and Effort

Making Progress

Did not attempt to follow instructions and/or clean up on a regular basis.
Meetins Expectation

Had one or two days of not using classtime wisely and/or did not clean up area.
Excels Expectation

Used classroom time wisely, followed instructions and cleaned up area on a regular basis.
Deadline

Making Progress

Submitted work considerably late
Meetins Expectation

Submitted assignment in an acceptable time frame
Excels Expectation

Submitted assignment on time



Keywords:
  • Proportion, grid system, contour drawing







Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98