Skip to main content
iRubric: Theatre Production Project-Costume rubric

iRubric: Theatre Production Project-Costume rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Theatre Production Project-Costume 
Rubric Code: ZX5W869
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: 6-8, 9-12

Powered by iRubric Theatre Project
Costume
  4

(N/A)

3

(N/A)

2

(N/A)

1

(N/A)

0

(N/A)

Content
60 %

15 points each for each part of the project:
Pictures
Rendering: 2 characters
Meets director's concept
Explain choices

4

Project is complete and contains all of the necessary parts and information.
3

Project is mostly complete and does not include one or two of the necessary parts and information.
2

Project is incomplete and does not include three or more of the necessary parts and information.
1

Project is late OR incomplete and does not include most of the necessary parts and information.
0

Project not turned in
Appearance
15 %

Neat
Organized
Creativity

4

Project is complete.
Project is neat overall and mostly organized.
Project shows all details in design or illustration.
Project is very well-thought out, creative, and visually interesting.
3

Project is complete.
Project is neat overall and mostly organized.
Project shows some or most details in design or illustration. Project is somewhat creative and visually interesting.
2

Project is complete.
Project is very neat and well organized.
Project shows few details in design or illustration.
Project is somewhat creative and visually interesting.
1

Project is late or incomplete.
Project is messy and or disorganized.
Project shows no details in design or illustration. Project is very basic and does not include much creativity.
0

Project was not turned in.
Ensemble
20 %

Teamwork
Collaboration
Cooperation
Compromise

4

Project group showed visible, oral, and visual proof of working as as ensemble.
3

Project group showed visible, oral, and visual proof of working as as ensemble most of the time.
2

Project group showed very little visible, oral, and visual proof of working as as ensemble.
1

Project group showed no visible, oral, and visual proof of working as as ensemble.
0

Project was not turned in.
Presentation & Submission
5 %

Each member presented
Each member knew the project
Appropriate volume

4

Project was submitted on time. Presentation to class covered all information about the project. Explanation is clearly understood and gives all necessary information about the project (what it is, what it represents)
3

Project was submitted on time. Presentation to class covered most information about the project. Explanation makes sense or gives most of the needed information about the project
(what is it, what it represents)
2

Project was submitted on time. Presentation to class covered some information about the project. Explanation makes sense or gives some of the needed information about the project
(what is it, what it represents)
1

Project was submitted late. Presentation to class was not made or was poorly done.
No explanation
or does not make sense.
0

Project was not turned in.



Keywords:
  • drama, project, theater


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98