Skip to main content
iRubric: Sewing Project Evaluation Rubric

iRubric: Sewing Project Evaluation Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Sewing Project Evaluation Rubric 
The student will select a t-shirt of choice. They will demonstrate cutting a rectangle or square from the shirt using a pattern for the pillow. They will apply interfacing to the pillow, use a sewing machine to stitch the pillow together, stuff the pillow and hand sew it closed.
Rubric Code: ZX8C534
Ready to use
Public Rubric
Subject: (General)  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Sewing Project Rubric
  Poor

1 pts

Good

3 pts

Excellent

5 pts

Seams

Poor

Seams are puckered. They are wider than what the instructions call for.
Good

Seams are wider than what are called for in the instructions. In some places correct sides of the fabric are together.
Excellent

Seams are correct in width and construction. Correct sides of fabric are together.
Stitches

Poor

Stitch length is not correct or consistents, and tension is too tight or too loose
Good

Stitch length is correct, but tension is too loose or too tight at times
Excellent

Stitch length is correct and tension is perfect
Cutting

Poor

Cutting lines are not straight and trimmed seams are uneven
Good

Cutting lines are straight and most of trimmed seams are even
Excellent

All cutting lines are straight and trimmed seams are all even
Ironing

Poor

Interfacing is not attached to pillow
Good
Excellent

Interfacing is placed in correct position and is ironed into place.
Neatness/Clean

Poor

Project looks dirty or stained and shows evidence of dirt and markings.
Good

Project is clean, but shows some evidence of dirt or markings.
Excellent

Project is clean and shows no evidence of dirt or markings.
Threads

Poor

Threads were not trimmed during the sewing process
Good

Some threads were trimmed during the sewing process
Excellent

All threads were trimmed during the sewing process
Backstitching

Poor

Seams were not backstitched during the construction process
Good

Most seams were backstitched during the construction process
Excellent

All seams were backstitched during the construction process
Handstitching

Poor

Stitches are visible. Stitches are various in size and spaced far apart.
Good

Stitches are somewhat the correct size and spaced correctly. Most stitches are invisible.
Excellent

Stitches are correct size and spaced to closing the pillow. Stitches are invisible.
Time Management

Poor

Project was turned in late - after the due date.
Did not use class time well; frequently off task.
Good

Project was turned in on time. Mostly used class time well with little off task time.
Excellent

Project was turned in on time or early. Used class time well and stayed on task.



Keywords:
  • t-shirt Pillow


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16