Skip to main content
iRubric: sampling project, MPAE II rubric

iRubric: sampling project, MPAE II rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
sampling project, MPAE II 
Students will choose a sample from any source, and will use material from that sample to create a 1:30-2:00 minute song. Students may add one track of additional audio; all other material for the song will come from the sample. A copy of the raw sample must be submitted with the completed project
Rubric Code: KXC732C
Ready to use
Public Rubric
Subject: Music  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Module 1 Project 1
  Exceeds

10 pts

Meets

7 pts

Developing

4 pts

Unsatisfactory

2 pts

Source Material

Exceeds

The student used material from the sample, and optionally, may include one additional track of audio.
Meets
Developing
Unsatisfactory

The student used material from the sample and more than one track of additional audio.
Duration

Exceeds

The track is within 1:30 and 2:00 long.
Meets

The track is shorter than 1:30 or longer than 2:00.
Developing

The track is shorter than 1:20 or longer than 2:10.
Unsatisfactory

The track is shorter than 1:00 or longer than 2:30.
Syncing

Exceeds

All tracks are synced well with each other and transitions are smooth between all sections of the piece.
Meets

All tracks are synced well with each other and transitions are smooth between some sections of the piece.
Developing

The general flow of the music is fine, but there are times when most of the tracks are not together.
Unsatisfactory

The music is not synced.
Musicality/Form

Exceeds

The piece has a clearly delineated form with transitions between sections. Each section is well developed.
Meets

The piece has a clear form with some transitions between sections.
Developing

The piece has a form, though it does not seem to be well-thought out. There are few or no transitions between sections.
Unsatisfactory

There is no clear form to the piece and the sections are unbalanced.
Sample

Exceeds

The student handed in the original sample as well as the completed project.
Meets
Developing
Unsatisfactory

The student did not hand in the original sample with the project.
Bouncing

Exceeds

The entire session was bounced to a stereo audio file and was shared in the Google drive folder.
Meets

The entire session was bounced to a mono audio file and was shared in the Google drive folder.
Developing

The entire session was not bounced correctly but was still shared in the Google drive folder.
Unsatisfactory

The entire session was not bounced correctly and was not shared in the Google drive folder.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98