Skip to main content
iRubric: Engineering Design Process: Angry Bird Catapult rubric

iRubric: Engineering Design Process: Angry Bird Catapult rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Engineering Design Process: Angry Bird Catapult 
This rubric is used to assess the students' use of the engineering design process for designing a catapult using kid friendly materials and tools without adult assistance. Limitations: Catapult must fit in a shoe box with close lid, materials and tools must be , have no sharp edged or protruding edges. contain mainly RECYCLABLE materials (not including the duct tape), have at least 3 different materials.
Rubric Code: EX5AB22
Ready to use
Public Rubric
Subject: Engineering  
Type: Project  
Grade Levels: K-5

Powered by iRubric Engineering Design Process
  Poor

1 pts

Fair

2 pts

Good

3 pts

Excellent

4 pts

Plan

Poor

You did not plan what you were going to build nor plan on what materials to use.
Fair

Some evidence of a plan. There was some thought to materials/building, but not really thought out.
Good

Good evidence of planning done. Materials were listed and thought out, but the plan wasn't quite complete.
Excellent

All materials were listed and well thought out. I can't wait to see how you build your toy for Winter.
Design

Poor

Your design lacked materials that were needed. It was really hard for me to tell what you built or were building.
Fair

Some materials were used correctly. The toy lacked creativity and there were parts that weren't secure.
Good

Good use of the materials and plan. The toy was nice and well put together, but there were parts that weren't secure.
Excellent

Great use of materials! You maximized your use of materials and created a great toy for Winter.
Time Management

Poor

Did not use time well. Time was wasted during the plan, and design phase of engineering.
Fair

Sometimes used time well. There were times when the group got off task during the plan, and design phase.
Good

Good use of time, there were a few times when the group got off task, but for the majority of the task time was well spent.
Excellent

Great use of time. The group stayed on task during each phase of the process.
Participation

Poor

You had to be reminded several times to stay on task.
Fair

You participated during the building process. The group had to be redirected a few times.
Good

You worked together and didn't have to be redirected that much at all.
Excellent

You worked together flawlessly and got the job done. The group never had to be redirected.



Keywords:
  • engineering, toys from trash

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16