Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Earthquake Building Rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Earthquake Building Rubric
Rubric Code:
BC2839
By
coreyrobert7
Ready to use
Public Rubric
Subject:
Science
Type:
Assessment
Grade Levels:
(none)
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Earthquake Building Rubric
Advanced
4 pts
Well-Developed
3 pts
Developing
2 pts
Needs Improvement
1 pts
Diagram (Blueprint)
Advanced
-Diagram drawn extremely well
-Professional look
-Highly detailed
-Parts of diagram labeled
-Easy to understand
Well-Developed
-Diagram drawn well
-Drawing is neat
-Good detail
-Most parts labeled
-Understandable
Developing
-Diagram Messy
-Not labeled
-Some detail
-Difficult to read or understand
Needs Improvement
-No diagram
-Poor or sloppy drawing
-Nearly impossible to read or understand
Use of Materials / Clean-up
Advanced
-Materials properly used and cared for.
-No materials wasted
-Area cleaned up
Well-Developed
-Materials used properly but some materials wasted
-Area reasonably cleaned up.
-Materials being put away
Developing
-Some or most materials wasted damaged or lost
-Area not clean
-Materials put away
Needs Improvement
-Most materials lost, damaged or wasted.
-Work area left a mess.
Team Cooperation
Advanced
-Group works very well together
-Ideas from all members listened to and respected
-Excellent participation
-Appropriate discussion of topic
Well-Developed
-Group works adequetly well.
-For the most part ideas respected and listened to by all members
-1 or 2 warnings given for lack of cooperation or participation
-Some arguing or inappropriate discussion
Developing
-Group not cooperating
-Not respecting or listening to others
-3 or more times warned for lack of cooperation or not participating.
-Arguing or inappropriate discussion
Needs Improvement
-Group not attempting to work or cooperate
-Inappropriate discussions not related to project.
-Total lack of participation
Building of Structure
Advanced
-Very well built
-Building completed on time
-Structure does not lean or wobble
-Meets height requirement
Well-Developed
-Structure stands on own, but wobbles or leans slightly
-Completed on time
-Meets height requirement
Developing
-Structure wobbles and leans significantly
-Requires extra time to complete
-Meets height requirement
Needs Improvement
-Structure does not stand on its own
-Does not meet height requirment
Final Test
Advanced
-Structure remains intact for more than 20 seconds (Magnitude 9-10 Earthquake)
Well-Developed
-Structure remains intact for 15-20 seconds (Magnitude 8-9)
Developing
-Structure remains intact for 10-15 seconds (Magnitude 7-8)
Needs Improvement
-Structure remains intact for less than 10 seconds (Magnitude 7)
Subjects:
Science
Types:
Assessment
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Science rubrics
More Assessment rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n16
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.