Skip to main content
iRubric: Alice Project 2 - Software Development Cycle rubric

iRubric: Alice Project 2 - Software Development Cycle rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Alice Project 2 - Software Development Cycle 
Students will create a new Alice World based on the Software Development Cycle, top-down design, and bottom-up development. They will develop their design before they will be allowed to start coding. They will have to turn in all design changes discovered as a result of the debugging stage of the cycle. A student can receive up-to the point amount in each category.
Rubric Code: X2348BW
Ready to use
Public Rubric
Subject: Computers  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Software Cycle
  Poor

5 pts

Fair

10 pts

Good

15 pts

Excellent

20 pts

Design

Poor

Design specifications 25% or less complete.
Fair

Design specifications 26% - 50% complete.
Good

Design specifications 51% - 75% complete.
Excellent

Design document contains specifications for starting scene, the initial position of objects, placement and orientation of cameras. It contains descriptions of the necessary objects, the methods associated with each object and the initial state of the world.
Implementation

Poor

Implementation coding 25% or less complete.
Fair

Implementation coding 26% - 50% complete.
Good

Implementation coding 51% - 75% complete.
Excellent

Alice world contains 10 methods with at least 5 lines of code. The main method (World.myfirst.method) contains only the calls to the 10 methods. All objects from the design document are added.
Test

Poor

Testing 25% or less complete.
Fair

Testing 26% - 50% complete.
Good

Testing 51% - 75% complete.
Excellent

All 10 methods are unit tested. Integration testing performed to make sure single methods work with each other.
Debug

Poor

Debuggin 25% or less complete.
Fair

Debugging 26% - 50% complete.
Good

Debugging 51% - 75% complete.
Excellent

Corrected mistakes found in the testing phase. Re-submitted design document with change in design as a result of the debugging phase. Made changes to code in implementation phase. Retested new changes.
Documentation

Poor

Documentation 25% or less complete.
Fair

Documentation 26% - 50% complete.
Good

Documentation 51% - 75% complete.
Excellent

All methods contain comments describing the author, the date, and what the method is used for. Methods contain notes that appear when the program is running. An instruction manual that describes what the program does and how the software works.



Keywords:
  • programming

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16