Skip to main content
iRubric: Budget Presentation: Cost of the Solution rubric

iRubric: Budget Presentation: Cost of the Solution rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Budget Presentation: Cost of the Solution 
Your group has designed a solution to solve a problem in the Indian River Lagoon. Now you are charged with calculating the cost of this solution. Each group will calculate the cost of their groups solution. Budget Presentations should include: a chart or spread sheet listing each cost (include pictures when possible), a description of each cost, proof of calculations (show your work), a grand total, and a sample product.
Rubric Code: PX96WA2
Ready to use
Public Rubric
Subject: Math  
Type: Project  
Grade Levels: K-5

Powered by iRubric Cost Controlls
  Poor

15 pts

Fair

20 pts

Good

25 pts

Purchases

Poor

There are no labels and/or pictures. Calculations cannot be read, or are missing.
Fair

Products are labeled.
Calculations for each item total is shown using expressions, words, or pictures.
Good

Products are labeled.
Individual prices from sources are listed. Calculations for each item total is shown using expressions, words, or pictures.
Calculations

Poor

The calculations of the solution were not included. Only an estimate (if that) was provided.
Fair

The calculations are included. They are difficult to follow and contain significant errors.
Good

The calculations are included. They are legible, buy may lack organization and accuracy.
Presentation

Poor

Student presentation of results was confusing, and he/she did not submit an information packet or visual.
Fair

Student presentation of results was some what clear, and he/she submitted an information packet and visual.
Good

Student presentation of results was in a clear, organized manner, and his/her cover to the information packet and the visual was neat.
Creativity

Poor

Solution is predictable and does not consider the budget. Environmental health was not considered or solution may do more harm than good.
Fair

Solution is unique, but does not consider the budget. Environmental health may or may not have been considered.
Good

Solution is predictable but budget conscious. Environment health was considered.



Keywords:
  • budget, cost

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16