Skip to main content
iRubric: Windows Networking Capstone Rubric

iRubric: Windows Networking Capstone Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Windows Networking Capstone Rubric 
Rubric to be used with Windows Networking Capstone Project
Rubric Code: C2X86W4
Ready to use
Public Rubric
Subject: Computers  
Type: Project  
Grade Levels: (none)

Powered by iRubric Criterion
  unsuccessful

0 pts

successful

1 pts

Patch Cables

unsuccessful

student was unsuccessul in making and testing the patch cables as required in Step 1 of the Capstone Project.
successful

student was successul in making and testing the patch cables as required in Step 1 of the Capstone Project.
Install Windows Server 2003

unsuccessful

student was unsuccessful in installing Windows Server 2003 and making it a domain controller.
successful

student was successful in installing Windows Server 2003 and making it a domain controller.
Setup a file server

unsuccessful

student was unsuccessful in setting up a file server on Windows Server 2003.
successful

student was successful in setting up a file server on Windows Server 2003.
create a user account

unsuccessful

student was unsuccessful in creating a student account once Windows Server 2003 was installed.
successful

student was successful in creating a student account once Windows Server 2003 was installed.
Roaming profile

unsuccessful

student was unsuccessful in creating a roaming profile for the user setup in step 4 of the Capstone Project.
successful

student was successful in creating a roaming profile for the user setup in step 4 of the Capstone Project.
Organizational Unit

unsuccessful

student was unsuccessful in creating an Organizational Unit as directed in step 6 of the Capstone Project.
successful

student was successful in creating an Organizational Unit as directed in step 6 of the Capstone Project.
Group Policy

unsuccessful

student was unsuccessful in creating a group policy for the Marketing OU as directed in step 7 of the Capstone Project.
successful

student was successful in creating a group policy for the Marketing OU as directed in step 7 of the Capstone Project.
Disk Quota

unsuccessful

student was unsuccessful in setting a disk quota for the root drive as directed in step 8 of the Capstone Project.
successful

student was successful in setting a disk quota for the root drive as directed in step 8 of the Capstone Project.
Troubleshooting

unsuccessful

student was unsuccessful in troubleshooting the problems given in step 9 of the Capstone Project.
successful

student was successful in troubleshooting the problems given in step 9 of the Capstone Project.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16