Drywall installation 
Students will participate in the calculation and installation of drywall panels in current house project according to local codes and standards.
Rubric Code: AXB962A
Draft
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Framing Model
  Excellent

3 pts

Acceptable

2 pts

Poor

1 pts

Material Estimation

Excellent

Student accuaratly estimates correct amount of drywall and length needed to complete project.
Acceptable

Student estimates amount and length with minor overage or inadequate amounts and with length chosen.
Poor

Student estimates an abundance or very inadequate amount with lenth chosen.
Overall Appearance

Excellent

The drywall is very clean looking and does not have excessive gaps or holes. Cuts around lights and boxes are clean.
Acceptable

There are some minor defective pieces cut or nailed. Joints are generally good. Minor issues with cuts around lights and boxes.
Poor

The drywall has various things misaligned. there are 2x4s that can be seen through the gaps. Various holes in panels. Cuts around lights and boxes are excessive.
Completeness

Excellent

All phases of drywall are built according to actuall building techniques and have the necessary members/fastners to be structurally sound.
Acceptable

There is one or two missing members/fastners from each stage of construction.
Poor

There are a few members missing. Not properly fastened and the job is incomplete.
Craft

Excellent

It is obvious that the team has taken time and care during construction. Cuts are straight and not jagged, there is no missed layout<BR>
issues.
Acceptable

Members, are slightly off the mark. There is moderate missed layout Materials may be only slightly misaligned.
Poor

Excessive missed layouts. Misalighned sheets.
Accuracy

Excellent

All members are strictly parrallel to each other. Panels are offset and fastenting is consistent throughout.
Acceptable

All walls are strictly measured for spacing b for windows, doors, or corner have cut problems. Most of the nailing is correct
Poor

Things ave not been measured for accuracy. Nail patterns are random.
Terminology

Excellent

The student knows what all of the components are.
Acceptable

The students uses some improper terminology, but has a grasp of the majority of the components.
Poor

The student uses improper terminology most of the time.
Participation

Excellent

Each team member has participated in the construction equally. Each member helped the other to know something new.
Acceptable

Each team member has participated in the construction equally.
Poor

The team worked poorly together.



Keywords:
  • Drywall installation

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to ready to use.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16