Hanging Drywall 
Basic drywall installation procedures in residential construction
Rubric Code: XXB962B
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Wall Framing
  Developing

0 pts

Proficient

75 pts

Accomplished

85 pts

Distinguished

100 pts

Safety & Tool Use

Developing

Safety glasses and other PPE come off even once during project. Work area is cluttered and tools are not used properly or put back properly.
Proficient

All necessary PPE is worn at all times. Work area is kept free of major obstacles, but scraps and unneeded tools are left out. Tools are used improperly more than once.
Accomplished

All necessary PPE is worn at all times. Work area is usually kept clutter free; scraps and unneeded tools are put away fairly quickly. Tools are always used properly and placed in their proper area.
Distinguished

All necessary PPE is worn at all times. Work area is kept clutter free; scraps and unneeded tools are put away immediately. Tools are always used properly and placed in their proper area.
Properly cut

Developing

Did not use proper tools. Needed help to cut drywall.
Proficient

Piece is broke. Cut is not straight. The piece is over 1/2" short.
Accomplished

Drywall was cut tight or between 3/8"-1/2" short. Cut was Made on the back. The cut is not straight.
Distinguished

Drywall was cut 1/4" short using a utility knife. The cut was made on the face and rasped straight.
Fasteners

Developing

Job was incomplete. drywall is not able to be finished.
Proficient

More than one fastner broke the paper. More than one clicker exist.
Accomplished

Incorect fastners were used. At least one fastner broke the paper. At least one clicker exist.+- Four fastners per stud.
Distinguished

Proper fastners were used. Fastner were set properly. Four fastners were evenly spaced on each stud.



Keywords:
  • PPE, dimension, discrepancy, flush, alignment, shiner, stud, plate, component

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98