Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Alice Project 2 - Software Development Cycle rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Alice Project 2 - Software Development Cycle
Alice Project 2 - Software Development Cycle
Students will create a new Alice World based on the Software Development Cycle, top-down design, and bottom-up development. They will develop their design before they will be allowed to start coding. They will have to turn in all design changes discovered as a result of the debugging stage of the cycle. A student can receive up-to the point amount in each category.
Rubric Code:
X2348BW
By
subalzero
Ready to use
Public Rubric
Subject:
Computers
Type:
Project
Grade Levels:
9-12
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Software Cycle
Poor
5 pts
Fair
10 pts
Good
15 pts
Excellent
20 pts
Design
Poor
Design specifications 25% or less complete.
Fair
Design specifications 26% - 50% complete.
Good
Design specifications 51% - 75% complete.
Excellent
Design document contains specifications for starting scene, the initial position of objects, placement and orientation of cameras. It contains descriptions of the necessary objects, the methods associated with each object and the initial state of the world.
Implementation
Poor
Implementation coding 25% or less complete.
Fair
Implementation coding 26% - 50% complete.
Good
Implementation coding 51% - 75% complete.
Excellent
Alice world contains 10 methods with at least 5 lines of code. The main method (World.myfirst.method) contains only the calls to the 10 methods. All objects from the design document are added.
Test
Poor
Testing 25% or less complete.
Fair
Testing 26% - 50% complete.
Good
Testing 51% - 75% complete.
Excellent
All 10 methods are unit tested. Integration testing performed to make sure single methods work with each other.
Debug
Poor
Debuggin 25% or less complete.
Fair
Debugging 26% - 50% complete.
Good
Debugging 51% - 75% complete.
Excellent
Corrected mistakes found in the testing phase. Re-submitted design document with change in design as a result of the debugging phase. Made changes to code in implementation phase. Retested new changes.
Documentation
Poor
Documentation 25% or less complete.
Fair
Documentation 26% - 50% complete.
Good
Documentation 51% - 75% complete.
Excellent
All methods contain comments describing the author, the date, and what the method is used for. Methods contain notes that appear when the program is running. An instruction manual that describes what the program does and how the software works.
Keywords:
programming
Subjects:
Computers
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Computers rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n98
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.