Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Toothpick bridge rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Toothpick bridge
Toothpick bridge
Students will design, construct and modify a bridge made of toothpicks and glue. They will choose construction jobs and be responsible for keeping records of amount spent on project and logs documenting the work of the team.
Rubric Code:
T24X845
By
Sdunn411
Ready to use
Public Rubric
Subject:
Physics
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Toothpick Bridge
Fair
2 pts
Good
4 pts
Excellent
6 pts
Design
Fair
Written plan is not shown. The bridge does not meet minimum design specifications.
Good
The bridge reflects some real world usage. Bridge roughly follows written plan. Planning is seen in the final product. Bridge meets minimum specifications.
Excellent
The design is realistic. Bridge follows written plan. Careful planning is seen in the final constructed bridge. The bridge exceeds minimum specifications.
Construction
Fair
Poor use of building materials. Glue is sloppy and messy with excess use in uneeded areas. Bridge is crooked and not lined up.
Good
Building materials are used well, but not to the best usage. Glue is appropriate, but not neat. Bridge is lined up, but not squared up.
Excellent
Excellent use of building materials to greatest effect. Final product is clean and neat. Bridge is lined up and square.
Accounting/Log
Fair
Balance sheet not presented. Bookkeeping not accurate.<BR>
Log not presented, or shows simple repetition and little analysis or use of the design process.
Good
Balance sheet has minor errors. Bookkeeping has omissions but care is evident. Log shows some careful analysis in places. The design process stages have been used.
Excellent
Balance sheet neat and accurate. Bookkeeping very carefully done.<BR>
Log shows clear evidence of the design process at work.
Keywords:
truss, supports, design
Subjects:
Engineering
Physics
Science
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Engineering rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n98
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.