Skip to main content
iRubric: Specification Binder rubric

iRubric: Specification Binder rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Specification Binder 
Students write industry standard specifications for materials and products for an educational project.
Rubric Code: S2XWB74
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: Undergraduate

Powered by iRubric Specification Binder
  Exemplary/Mastery

150%<BR>
Excellence

15 pts

Accomplished

135%<BR>
Approaching Excellence

13.5 pts

Capable/Average

113%<BR>
Acceptable Standard

11.3 pts

Developing

Max 75%<BR>
Unacceptable

7.5 pts

Beginning/no project

37%<BR>
Unacceptable

3.7 pts

Cover Page
10 pts

Exemplary/Mastery

Project has a typed cover page that includes all of:
___ name/firm
___ project
___ date
___course
___instructor
___date
Accomplished

Project has a typed cover page that includes most of:
___ name/firm
___ project
___ date
___course
___instructor
___date
Capable/Average

Project has a typed cover page that includes half of:
___ name/firm
___ project
___ date
___course
___instructor
___date
Developing

Project has a typed cover page that includes 1-2 of:
___ name/firm
___ project
___ date
___course
___instructor
___date
Beginning/no project

Project cover page is not typed or is missing all of:
___ name/firm
___ project
___ date
___course
___instructor
___date
Table of Contents
10 pts

Exemplary/Mastery

___ TOC is typed with tabs that coordinate and allow the user to easily read/locate information
Accomplished

___ TOC is typed with tabs that mostly coordinate and/or the user finds it easy to read/locate most of the information
Capable/Average

___ TOC is typed with half the tabs that coordinate and it is not easy to read/locate information
Developing

___ TOC and/or tabs are not typed and may not be easy to read/locate information
Beginning/no project

___ TOC and tabs are missing
Concept Statement
10 pts

Exemplary/Mastery

___ Statement is well written with perfect spelling, grammar and punctuation, uses many descriptive adjectives

___ Describes the intended look and feel of the project very well
Accomplished

___ Statement is mostly well written and/or has 1-3 errors in spelling, grammar and punctuation, uses many descriptive adjectives

___ Describes the intended look and feel of the project pretty well
Capable/Average

___ Statement needs some revision; has 4-8 errors spelling, grammar and punctuation, uses some descriptive adjectives

___ Does not describes the intended look and feel of the project
Developing

___ Statement needs major revisions to content, spelling, grammar and punctuation

___ Does not describe the intended look and feel of the project
Beginning/no project

___ Statement is missing
Floor Plan
10 pts

Exemplary/Mastery

___ Coordinates with codes on finish schedule

___Is 11 x 17 or larger and is clear and easy to read

___ Rendering is optional
Accomplished

___ A significant portion coordinates with codes on finish schedule

___Is 11 x 17 or larger and mostly easy to read
Capable/Average

___ Is missing approximately half of finishes and/or does not coordinate with finish schedule

___Is not 11 x 17 or larger and not very easy to read
Developing

___ Is very incomplete/missing the majority of finishes

___Is not 11 x 17 or larger and is difficult to read and understand
Beginning/no project

___ Is missing completely
Room Finish Schedule & Legend
10 pts

Exemplary/Mastery

___ Schedule lists all of the rooms on each floor in order
___ includes project name and location
___ Finishes on legend use Product Codes and are complete and correct
Accomplished

___ Schedule lists most of the rooms on each floor in order
___ includes most of project name and location
___ Most finishes on legend use Product Codes and most are complete and correct
Capable/Average

___ Schedule lists half of the rooms on each floor in order,
___ includes half of project name and location
___ Half of the finishes on legend use Product Codes and at least half are complete and correct
Developing

___ Schedule is missing most rooms on each floor in order
___ is missing most of project name and location
___ Finishes on legend are mostly missing Product Codes and/or most are incorrect
Beginning/no project

___ Schedule lists 0-5 rooms
___ is missing project name and location
____ Finishes on legend are missing and/or most are incorrect
5 Digital Sample Finish Boards
10 pts

Exemplary/Mastery

___ Boards are complete, with each finish labeled and keyed to the finish plan.
___ Lobby (Kitchen for 3rd)
___ Restroom
___ Office
___ Classroom
___ Elevator Cab
Accomplished

___ Boards are mostly complete, most finishes are labeled and keyed to the finish plan.
___ Lobby (Kitchen for 3rd)
___ Restroom
___ Office
___ Classroom
___ Elevator Cab
Capable/Average

___ Boards are half complete, with half of the finishes labeled and keyed to the finish plan.
___ Lobby (Kitchen for 3rd)
___ Restroom
___ Office
___ Classroom
___ Elevator Cab
Developing

___ Boards are very incomplete, with each finish missing labeling and keying to the finish plan.
___ Lobby (Kitchen for 3rd)
___ Restroom
___ Office
___ Classroom
___ Elevator Cab
Beginning/no project

___ Boards are missing as well as missing labeling
___ Lobby (Kitchen for 3rd)
___ Restroom
___ Office
___ Classroom
___ Elevator Cab
Digital Board Completeness
10 pts

Exemplary/Mastery

Includes all of:
___ceiling, wall, floor
___ wall base
___ furniture
___ textiles
___ cabinetry
___ countertops
___lighting
___millwork
___ artwork (optional)
Accomplished

Includes most of:
___ceiling, wall, floor
___ wall base
___ furniture
___ textiles
___ cabinetry
___ countertops
___lighting
___millwork
___ artwork (optional)
Capable/Average

Is missing half of:
___ceiling, wall, floor
___ wall base
___ furniture
___ textiles
___ cabinetry
___ countertops
___lighting
___millwork
___ artwork (optional)
Developing

Is missing most of:
___ceiling, wall, floor
___ wall base
___ furniture
___ textiles
___ cabinetry
___ countertops
___lighting
___millwork
___ artwork (optional)
Beginning/no project

Is missing all of:
___ceiling, wall, floor
___ wall base
___ furniture
___ textiles
___ cabinetry
___ countertops
___lighting
___millwork
___ artwork (optional)
Follows Assignment Direction
10 pts

Exemplary/Mastery

___Content is completely organized in the order required
Accomplished

___A significant portion of the content is organized according to assignment direction
Capable/Average

___A majority of the content is organized according to assignment direction
Developing

___A significant portion of lacks organization according to assignment direction
Beginning/no project

___Content does not follow the assignment direction in terms of organization at all
Specification Sheets
50 pts

Exemplary/Mastery

___Includes all the required information
___ room number, name
___ manufacturer name, address, phone #
___material image - good quality
___ catalog name/number
___ color, finish, pattern
___ installation
___ justification
___ quantity if applicable
___ product code
Accomplished

___Includes most of the required information
___ room number, name
___ manufacturer name, address, phone #
___material image - good quality
___ catalog name/number
___ color, finish, pattern
___ installation
___ justification
___ quantity if applicable
___ product code
Capable/Average

___Includes half of the required information
___ room number, name
___ manufacturer name, address, phone #
___material image - good quality
___ catalog name/number
___ color, finish, pattern
___ installation
___ justification
___ quantity if applicable
___ product code
Developing

___Includes some of the required information
___ room number, name
___ manufacturer name, address, phone #
___material image - good quality
___ catalog name/number
___ color, finish, pattern
___ installation
___ justification
___ quantity if applicable
___ product code
Beginning/no project

____Includes none or very little of the required info
___ room number, name
___ manufacturer name, address, phone #
___material image - good quality
___ catalog name/number
___ color, finish, pattern
___ installation
___ justification
___ quantity if applicable
___ product code
Quantities (Spec.'s) per floor
20 pts

Exemplary/Mastery

Includes all of the required quantities:
___ (2) carpet tile
___ (2) resilient floors
___ (2) hard surface fl.
___ (4) paint min. 2 sheen
___ (3) wall coverings
___ (1) specialty wall tr.
___ (1) wall base
Restrooms:
___ (3) wall, floor, ceiling
___ (2) toilet partition
___ (1) countertop
___ (1) trim tile @cove/top
___ (2) countertop finishes
Accomplished

Includes most of the required quantities:
___ (2) carpet tile
___ (2) resilient floors
___ (2) hard surface fl.
___ (4) paint min. 2 sheen
___ (3) wall coverings
___ (1) specialty wall tr.
___ (1) wall base
Restrooms:
___ (3) wall, floor, ceiling
___ (2) toilet partition
___ (1) countertop
___ (1) trim tile @cove/top
___ (2) countertop finishes
Capable/Average

Includes half of the required quantities:
___ (2) carpet tile
___ (2) resilient floors
___ (2) hard surface fl.
___ (4) paint min. 2 sheen
___ (3) wall coverings
___ (1) specialty wall tr.
___ (1) wall base
Restrooms:
___ (3) wall, floor, ceiling
___ (2) toilet partition
___ (1) countertop
___ (1) trim tile @cove/top
___ (2) countertop finishes
Developing

Includes a few of the required quantities:
___ (2) carpet tile
___ (2) resilient floors
___ (2) hard surface fl.
___ (4) paint min. 2 sheen
___ (3) wall coverings
___ (1) specialty wall tr.
___ (1) wall base
Restrooms:
___ (3) wall, floor, ceiling
___ (2) toilet partition
___ (1) countertop
___ (1) trim tile @cove/top
___ (2) countertop finishes
Beginning/no project

Most are missing:
___ (2) carpet tile
___ (2) resilient floors
___ (2) hard surface fl.
___ (4) paint min. 2 sheen
___ (3) wall coverings
___ (1) specialty wall tr.
___ (1) wall base
Restrooms:
___ (3) wall, floor, ceiling
___ (2) toilet partition
___ (1) countertop
___ (1) trim tile @cove/top
___ (2) countertop finishes
Quantities (Spec.'s) per floor
10 pts

Exemplary/Mastery

Elevator cab:
___ (3) floor, wall, ceiling
___ (1) stair flooring
___ (2) millwork
___ (3) furniture
___ (5) textiles
Accomplished

Elevator cab:
___ (3) floor, wall, ceiling
___ (1) stair flooring
___ (2) millwork
___ (3) furniture
___ (5) textiles
Capable/Average

Elevator cab:
___ (3) floor, wall, ceiling
___ (1) stair flooring
___ (2) millwork
___ (3) furniture
___ (5) textiles
Developing

Elevator cab:
___ (3) floor, wall, ceiling
___ (1) stair flooring
___ (2) millwork
___ (3) furniture
___ (5) textiles
Beginning/no project

Elevator cab:
___ (3) floor, wall, ceiling
___ (1) stair flooring
___ (2) millwork
___ (3) furniture
___ (5) textiles
Appropriateness
10 pts

Exemplary/Mastery

___ Materials/Products selected are all appropriate for intended application
Accomplished

___ A signiifcant portion of the Materials/Products selected are appropriate for intended application
Capable/Average

___ Half of the Materials/Products selected are appropriate for intended application
Developing

___ Some of the Materials/Products selected are appropriate for intended application
Beginning/no project

___ Materials/Products selected are missing or completely not appropriate for intended application
Overall Quality & Presentation
10 pts

Exemplary/Mastery

__ All words are spelled correctly with no grammatical or punctuation errors
Accomplished

__ 1-3 words are misspelled with no grammatical or punctuation errors
Capable/Average

__ 4-7 words are misspelled words with some grammatical or punctuation errors
Developing

__ There are a significant amount of misspelled words and grammatical or punctuation errors
Beginning/no project

___ Almost all the words are spelled incorrectly / significant grammatical or punctuation errors
Sustainability Statement
10 pts

Exemplary/Mastery

___ Statement is a one page well written essay

___ Discusses how 10 spec's meet LEED credits
Accomplished

___ Statement is less than one page and/or has 1-6 misspelled words, punctuation, grammatical errors

___ Discusses how 7-9 spec's meet LEED credits
Capable/Average

___ Statement is less than one page and/or has 7-15 misspelled words, punctuation, grammatical errors

___ Discusses how 4-6 spec's meet LEED credits
Developing

___ Statement is less than one page and/or has 16 or more misspelled words, punctuation, grammatical errors

___ Discusses how 1-3 spec's meet LEED credits
Beginning/no project

___ Essay is missing

___ Does not discusses how 10 spec's meet LEED credits at all
Bibliiography
10 pts

Exemplary/Mastery

___ An extensive list of reliable research sources are listed.

___ Sources are properly cited and include dates
Accomplished

___ 21-25 research sources are listed. A significant portion are reliable

___ A majority of the sources are mostly properly cited and dated
Capable/Average

___15-20 research sources are listed, but most are not reliable

___ Sources are not properly cited or dated
Developing

___ 10 or less research sources are listed. They are not completely reliable

___ Sources are not properly cited or dated and are missing
Beginning/no project

___ All sources are missing

___ Sources are not properly cited or dated and are completely missing





Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16