Skip to main content
iRubric: Straw Bridge Challenge rubric

iRubric: Straw Bridge Challenge rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Straw Bridge Challenge 
Arch, truss, or beam bridge to be made out of plastic straws and tape. The bridge must span distance of 30 centimetres. The bridge must be able withstand a minimum of 500g of weight without failing.
Rubric Code: EXB47C4
Ready to use
Public Rubric
Subject: Engineering  
Type: Project  
Grade Levels: (none)

Powered by iRubric Forces Acting on Structures:
Plastic Straw Bridge
  Level 1

(N/A)

Level 2

(N/A)

Level 3

(N/A)

Level 4

(N/A)

Appearance

Level 1

Not aesthetically pleasing (shapes, patterns, etc.)

Work is sloppy throughout.

Design is unattractive and/or plain.
Level 2

Limited aesthetics
(shapes, patterns, etc.)

Design and use of tape is messy at times.

Some visual appeal.
Level 3

Overall, an attractive bridge (shapes, patterns, etc

Tidy work most of the time.

Visually appealing.
Level 4

Extremely aesthetic in design (shapes, patterns, etc.

All constuction is clean and attractive.

Exceptionally visually appealing.
Structure

Level 1

Basic beam bridge (no real design).

Does not span a gap of 30 centimetres (unstable or incomplete).


Did not maximize use of materials (e.g. many straws and tape left over).
Level 2

Beam or arch bridge with limited creative design.

Spans a gap of 30 centimetres, but remains unstable or incomplete in some way.



Good use of materials.
Level 3

Beam, truss, or arch bridge designed with good creativity.

Spans a gap of 30 centimetres, is complete and stable.



Very good use of materials.
Level 4

Arch bridge designed with excellent creativity.

Spans a gap of 30 centimetres is complete and stable.



Excellent use of materials.
Weight Held

Level 1

Held 0-100 pennies
Level 2

Successfully held 101-150 pennies.
Level 3

Successfully held 151-250 pennies.
Level 4

Held over 250 pennies.
Teamwork

Level 1

Partners ..no team work.. one person ran the show!
Level 2

Partners ..some team work.
Level 3

Partners were working together, but occasionally distracted from their project in some way.
Level 4

Each person was actively involved in the building process.





Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16