Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Budget Presentation: Cost of the Solution rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Budget Presentation: Cost of the Solution
Budget Presentation: Cost of the Solution
Your group has designed a solution to solve a problem in the Indian River Lagoon. Now you are charged with calculating the cost of this solution. Each group will calculate the cost of their groups solution. Budget Presentations should include: a chart or spread sheet listing each cost (include pictures when possible), a description of each cost, proof of calculations (show your work), a grand total, and a sample product.
Rubric Code:
PX96WA2
By
cheftim
Ready to use
Public Rubric
Subject:
Math
Type:
Project
Grade Levels:
K-5
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Cost Controlls
Poor
15 pts
Fair
20 pts
Good
25 pts
Purchases
Poor
There are no labels and/or pictures. Calculations cannot be read, or are missing.
Fair
Products are labeled.
Calculations for each item total is shown using expressions, words, or pictures.
Good
Products are labeled.
Individual prices from sources are listed. Calculations for each item total is shown using expressions, words, or pictures.
Calculations
Poor
The calculations of the solution were not included. Only an estimate (if that) was provided.
Fair
The calculations are included. They are difficult to follow and contain significant errors.
Good
The calculations are included. They are legible, buy may lack organization and accuracy.
Presentation
Poor
Student presentation of results was confusing, and he/she did not submit an information packet or visual.
Fair
Student presentation of results was some what clear, and he/she submitted an information packet and visual.
Good
Student presentation of results was in a clear, organized manner, and his/her cover to the information packet and the visual was neat.
Creativity
Poor
Solution is predictable and does not consider the budget. Environmental health was not considered or solution may do more harm than good.
Fair
Solution is unique, but does not consider the budget. Environmental health may or may not have been considered.
Good
Solution is predictable but budget conscious. Environment health was considered.
Keywords:
budget, cost
Subjects:
Math
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Math rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n16
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.